Similar Projects
New Elementary School
New Construction
Conception
Tomball, TX

Jenkins Road Waterline Improvements - W061 - City of Pasadena
Infrastructure
Conception
$2,500,000 CJ est. value
Pasadena, TX 77506

MUNI - Petco / Brookhollow Marketplace - Boucher Design Group, LLC
New Construction, Infrastructure - 11,065 SF
Design
$1,065,000 CJ est. value
Houston, TX 77092

Starbucks East Orem 288 / Coffee Shop
New Construction, Infrastructure - 2,017 SF
Design
$980,000 CJ est. value
Houston, TX 77048

Ault Elementary School Renovation
Renovation
Post-Bid
Cypress, TX 77433

2021 Farney McFee Swenke ES Renovations
Renovation
Post-Bid
$19,000,000 CJ est. value
Cypress, TX 77429

Open Space Improvements to Serve Silverchase Meadows Park
Infrastructure
Results
$317,563 CJ est. value
Houston, TX 77014

Construction of Water and Paving Facilities For Bridge Creek Terrace Drive Street Dedication 2
Infrastructure
Results
$1,543,652 CJ est. value
Cypress, TX 77433

East River Phase I
New Construction - 649,156 SF
Construction
Houston, TX 77020

Yellowstone Academy
Renovation - 3,000 SF
Construction
$1,700,000 est. value
Houston, TX 77004

Eagle's Trace RB 3.2
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Houston, TX 77077

Katy ISD Schmalz Elementary School Addition and Renovation
Addition, Demolition, Renovation, Infrastructure - 20,532 SF
Pending Verification
$7,133,736 CJ est. value
Houston, TX 77084

Rudel Road Apartments
New Construction, Infrastructure - 30,133 SF
Design
$2,200,000 CJ est. value
Tomball, TX 77375

Hutsell Elementary Comprehensive Renovations
New Construction, Renovation, Infrastructure - 112,498 SF
Post-Bid
$16,500,000 CJ est. value
Katy, TX 77493

Water Plant No. 1 Emergency Generator for West Harris County Municipal Utility District No. 6
Renovation, Infrastructure
Results
$595,000 CJ est. value
Houston, TX 77002

Last Updated 12/27/2023 02:33 PM
Project Title

Construction Services for GCCISD Education Services Center Phase 2 Project

Physical Address View project details and contacts
City, State (County) Baytown, TX 77520   (Harris County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $7,850,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Question Deadline 09/12/2023 at 3:00 PM CT The GCCISD reserves the right to accept or reject any Submission or any part thereof or any combination of Submissions and to waive any or all formalities Final Completion: October 3, 2024 Notice to Proceed: October 3, 2023 GCCISD has ascertained and adopted the prevailing wage rates for school construction trades (effective June 12, 2019) in accordance with Chapter 2258 of the Texas Government Code The work includes but is not limited to the following: Construct a new 21,000 SF building with shell space for future Education Center. The facility will consist of the shell space to be built out at a later date, as well as construction of a catering kitchen, food storage area, and mechanical / electrical rooms, and all associated HVAC, electrical, plumbing, telecommunications, and other work as described in the documents for a fully functioning building. Site modifications include new landscaping with irrigation system, replacement of portions of existing sidewalks, enlarging of existing parking lot, enlarging existing detention, and all required utility work as described in the documents for fully functioning building. The estimated construction budget for this project is $7,850,000.00

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents