Similar Projects
Final Effluent Pump Station And Stormwater Channel Improvements
New Construction
Conception
$12,754,000 est. value
San Jose, CA 95134

BVF Comfort Station and Water Supply
New Construction
Design
$1,000,000 to $5,000,000 est. value
Yosemite National Park, CA

Pump Station Recovery Mitigation Project
Renovation
Bidding
Long Beach, CA

Copper Cove Lift Station 6, 8, 15 and 18 Renovations and Lift Station 12 and 13 Force Main Bypass Project
Renovation
Bidding
$7,190,000 est. value
Copperopolis, CA 95228

LillyHill & L Street Water Booster Station
Renovation
Post-Bid
$1,500,000 est. value
Needles, CA 92363

Bridalveil Fall Comfort Station & Water Supply
New Construction
Post-Bid
Yosemite Lakes, CA

Plant Structural Improvements
New Construction
Results
$2,500,000 est. value
Modesto, CA 95351

Z--CA-Stone Lakes NWR-Pumps Station Replace
Renovation
Results
Elk Grove, CA 95757

1.3 MG Fleming Zone 8 Reservoir and Zone 8 to 9 Pump Station
Renovation
Bidding
$13,000,000 est. value
Irvine, CA

Inspect and Repair Rebuild Eight Turbine Pumps
Renovation
Post-Bid
Redding, CA

Sewage Lift Station Pump Maintenance
New Construction
Results
$330,000 est. value
Carlsbad, Huntington Beach, Laguna Beach, San Clemente, CA

P Street Lift Station Upgrade and Modification
Renovation
Bidding
$3,500,000 to $4,250,000 est. value
Live Oak, CA 95953

Parker Pump Station Replacement
New Construction, Demolition
Post-Bid
$17,400,000 to $19,400,000 est. value
Coronado, CA

Boathouse Lift Station Replacement Project
Renovation
Results
$300,000 est. value
Fremont, CA 94538

Lone Pine Booster Station and Water Storage Project
Renovation, Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Lone Pine, CA

Reported 06/21/2022 10:53 AM
Project Title

Oakmead, Redwood, And Outlet Mall Lift Station Upgrades - C66501923 - City Of Petaluma

Physical Address View project details and contacts
City, State (County) Petaluma, CA 94952   (Sonoma County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $1,800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project upgrades pumps and controls for several lift stations in the City. These lift stations were all constructed around the same time period and the required upgrades will be similar. Currently, operations must rapidly respond to any issues due to very limited storage capacities. The project includes necessary electrical upgrades, pump replacement, and valve improvements, along with instrumentation upgrades for integration into the City's Supervisory Control and Data Acquisition (SCADA). The project will make the lift stations compatible with operations at the Ellis Creek Water Recycling Facility (ECWRF). ECWRF staff has prioritized the Outlet Mall lift station for rehabilitation. As of June 20, 2022, this project is currently in the City of Petaluma FY 2022-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents