Similar Projects
New Antennas
Alteration
Design
Ashland, OR

Pringle Elementary School
Addition, Demolition, Alteration
Bidding
Salem, OR

Windy Creek Bridge Replacement Reuben Road
Alteration
Bidding
$2,100,000 est. value
Roseburg, OR

Ecola Ridge Young Stand Thinning Restoration Project
Alteration
Post-Bid
Cannon Beach, OR 97110

Dpt Drilling Services In Portland
Infrastructure
Post-Bid
Portland, OR

OR 214 - Johna Ln. - Fenne Ln. (Silverton) Sec. Silver Creek Falls Vidal Francis, Pm
Infrastructure
Results
$500,000 to $1,000,000 est. value
Silverton, OR

ADA Ramps - W Baseline Road
Alteration
Results
$300,000 to $400,000 est. value
OR

US101: Landslide Repair (Johnson Creek) Project
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Depoe Bay, OR 97341

Excavation Service
Infrastructure
Post-Bid
Astoria, OR

US101: MP 348.45 NB Landslide Mitigation
Infrastructure
Results
OR

OR DOT CRGNSA 100(6), Historic Columbia River Highway State Trail
Term Contract, Alteration
Post-Bid
Hood River, OR

Big Creek Hatchery Residence Replacement Site Work
Infrastructure
Results
$40,000 to $45,000 est. value
Astoria, OR 97103

Fairview Creek Pipe Culvert Joint Repair
Infrastructure
Post-Bid
Gresham, OR

North Williams Street Storm Improvements
Infrastructure
Results
Lebanon, OR 97355

Transfer Station Drainage Area Improvements
Infrastructure
Post-Bid
Oakland, Yoncalla, OR

Last Updated 03/04/2022 01:13 AM
Project Title

I-84: Corbett Interchange-Multnomah Falls Section of the Columbia River Highway (Rt. No. I-84)

Physical Address View project details and contacts
City, State (County) Corbett, OR   (Multnomah County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

I-84: Corbett Interchange-Multnomah Falls Section of the Columbia River Highway (Rt. No. I-84) in Corbett. Req. approx. 2,000 ft2 temp sign; 4 ea seq arr sign; 5 ea PCMS; 4 ea radar spd trail; 48 ea TCS; 3 ea temp impact atten; 1.2 acre mulch; 6 ea check dam; 200 ft sed fence; 200 ft sed barr; 15 ton contam soil disp; 13 ft remove pipe; 14 yd3 ditch exc; 20 yd2 geotext; 12 yd3 riprap; 753 ft CIPP liner; 1,506 ft vid insp; 8 ft pipe; 14 ea culv drain markrs; 1.2 acre seed Goal: Indian Employement preference goal : 3%

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents