Similar Projects
2022 Bond - Proposition B - McDade Independent School District
Addition, Demolition, Renovation, Infrastructure
Conception
$23,000,000 CJ est. value
McDade, TX 78650

2023 Bond Passed - Bastrop Independent School District
Addition, Demolition, New Construction, Renovation, Infrastructure
Conception
$321,500,000 CJ est. value
Bastrop, TX 78602

Yerico Manufacturing Warehouse
New Construction, Infrastructure - 30,000 SF
Design
$2,500,000 CJ est. value
Elgin, TX 78621

Yerico Manufacturing - Manufacturing Space & Accessory Office
New Construction, Infrastructure - 20,064 SF
Design
$4,000,000 CJ est. value
Elgin, TX 78621

County Line Road Construction Project
Infrastructure
Bidding
$700,000 CJ est. value
Elgin, TX 78621

NW 1st Street Sidewalks & Main Street ADA Ramps / City of Smithville
Infrastructure - 25,000 SF
Bidding
$600,000 CJ est. value
Smithville, TX 78957

Construction of Fiberglass Reinforced Polymer (FRP) Trail Bridges at Bastrop State Park
New Construction, Infrastructure
Post-Bid
$350,000 est. value
Bastrop, TX 78602

Solicitation for Horizontal Construction Indefinite Delivery Contracts (IDC) under Multiple Award Task Order Contract (MATOC) in Support of the US Army Corps of Engineers, Galveston District and Southwestern Division
New Construction
Post-Bid
Less than $7,000,000,000 est. value

CR - Bridge Replacement
New Construction, Infrastructure
Results
$713,795 est. value
TX

FM 20 - Bridge Replacement
New Construction
Results
$1,662,058 est. value
Red Rock, TX

Project Echo - SpaceX Facility / Texas
New Construction, Infrastructure - 521,521 SF
Construction
$43,000,000 CJ est. value
Bastrop, TX 78602

Smart Painting Offices / Elgin
New Construction, Infrastructure - 9,150 SF
Construction
$150,000 CJ est. value
Elgin, TX 78621

Bastrop Rapid Express / Rapid Express Car Wash
New Construction, Infrastructure - 4,000 SF
Pending Verification
$1,500,000 CJ est. value
Bastrop, TX 78602

Carr Lane Manufacturing Facility
New Construction, Infrastructure - 49,948 SF
Pending Verification
$4,400,000 CJ est. value
Elgin, TX 78621

New Schools and Classroom Expansion - 2023 Bond - Bastrop Independent School District
Addition, New Construction, Infrastructure, Renovation
Conception
$272,774,000 CJ est. value
Bastrop, TX 78602

Last Updated 08/28/2023 12:06 PM
Project Title

Reconstruct Copperas Creek CCC Footbridge at Bastrop State Park

Physical Address View project details and contacts
City, State (County) Bastrop, TX 78602   (Bastrop County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $44,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Estimate $40,000.00 - 60,000.00 Question Deadline 06/26/2023 at 2:00 PM CT All requests, questions, or other communications about this Solicitation shall be made in writing to TPWDs Infrastructure Division, addressed to the following person: Nicole Chupka, Contract Manager Texas Parks & Wildlife Department 4200 Smith School Road, Austin, Texas 78744 Phone: 512-389-4483 Email: nicole.chupka@tpwd.texas.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. General Scope of Work: Provide all labor, materials, equipment, appurtenances, insurance, bonds and supervision to reconstruct the Copperas Creek CCC Footbridge. This includes but is not limited to replacing all existing and missing abutment posts and rails; and repairing the existing stone abutments as needed and in accordance with the Civilian Conservation Corps (CCC) details provided in the project drawings. Project Schedule: All work shall be completed within two hundred and seventy (270) calendar days commencing on the date specified in the Notice to Proceed. This performance period includes completing the various aspects required to complete the Work, including submission of all Submittals, mobilization, procurement, installation, testing, inspection and delivery of documents described in Terms and Conditions. For technical information and information regarding administration of the contract, contact Contract Manager, Nicole Chupka, using nicole.chupka@tpwd.texas.gov or 512-389-4423. The project site/area for construction is accessible to the public. Any prospective bidder may travel to Bastrop State Park as a general visitor. Prospective bidders shall inform park staff at entrance gates that they are visiting to view the site for the footbridge construction project and may show a screenshot of this advertisement. In order to minimize disruption to park operations and protect visitor experience, TPWD must limit prospective bidder visits to only the dates of June 22, June 23, or June 26, 2023 and only between the hours of 10:00 a.m. and 4:00 p.m. The area for construction is best accessed by parking at the Copperas Creek Camping Loop and walking to camp sites 66 and 67. The CCC Footbridge is to be reconstructed over the creek in the area between sites 66 and 67. Please see the camp loop location more clearly in the Park Map enclosed with this advertisement as Attachment G. Bastrop State Park is located at 100 Park Road 1A in Bastrop, Texas 78602. The park entrance is about one mile east of the town of Bastrop on Texas 21; also accessible from the east on Texas 71; also accessible by way of Buescher State Park along Park Road 1. Visitors using GPS are advised to enter "Park Rd 1 Bastrop , TX 78602" for most direct mapping. This site visit is not mandatory, however, TPWD strongly encourages potential bidders to view the project site and offers no guarantee that the site will be accessible to potential bidders at any times other than what has been described in this solicitation package. Failure to take advantage of the site visit time listed herein may result in potential bidders who are unable to visit the project site at all. Failure to give proper consideration to site conditions when preparing the bid will not constitute grounds for additional compensation.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents