Similar Projects
Highway Garage HVAC Upgrades and Repairs
Renovation
Sub-Bidding
$100,000 CJ est. value
Lake View, NY 14085

Renovate Sports Arena Ice Rink Refrigeration System at Buffalo State College
Alteration
Post-Bid
Buffalo, NY 14222

Lockwood Library - Chilled Water Upgrades at Building Entrance
Alteration
Post-Bid
Buffalo, NY 14228

Cooke Hall - Chilled Water Upgrades at Building Entrance
Alteration
Results
Buffalo, NY 14260

Furnas Hall - Chilled Water Upgrades at Building Entrance
Alteration
Results
Buffalo, NY 14260

HVAC Replacement at 485 Cayuga Road
Alteration
Post-Bid
Buffalo, NY 14225

Senior Center HVAC improvements
Alteration
Results
$20,000 est. value
Tonawanda, NY 14150

Air Conditioner
Alteration
Post-Bid
NY

Senior Center HVAC Improvements
Alteration
Results
Boston, NY 14025

Senior Center HVAC Improvement Project
Alteration
Post-Bid
Depew, NY 14043

Lancaster CSD Renovations 2018 423 - HVAC
Renovation
Results
$956,400 CJ est. value
Lancaster, NY 14086

A/C Replacement at School 90
Alteration
Post-Bid
Buffalo, NY 14211

Southtowns AWTF Roof Replacement & Effluent HVU Replacement - General
Renovation
Results
$3,580,000 CJ est. value
Buffalo, NY 14219

Air Handling Unit Replacement and Mechanical Upgrades
Alteration
Post-Bid
$200,000 est. value
Buffalo, NY 14214

Southtowns Advanced Wastewater Treatment Facility (AWTF), Roof and HVAC Replacement - HVAC
Renovation
Results
$2,058,400 CJ est. value
Buffalo, NY 14219

Last Updated 05/15/2023 02:41 PM
Project Title

Plant/Boiler Master Control System Replacement

Physical Address View project details and contacts
City, State (County) Buffalo, NY 14202   (Erie County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $773,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Allen Bradley/Rockwell PLC -based Plant Master Control System with the below minimum requirements: System: Hot Water Mounting Style: Wall Mount - Type 4 Processor: Compact Logix L19ER HMI, Local: 10" PV+ Allen Bradley / Rockwell Boiler Control System with the below minimum requirements: System: Hot Water Mounting Style: Wall Mount - Type 4 Panel Components: LED enclosure, field terminals, wiring ducts, 24Vdc power supply, UL 489 Breakers and circuit protection. Processor BMS: Honeywell RM7840 - Preliminary Processor CCS: Compact Logix hardware Burner Management System (BMS): PLC Input - 120V Combustion Control System (CCS): CCS PLC Input 4-20mA, Output 4-20mA Technical Services to include: Remove and dispose of exiting boiler control panel, mount new, terminate wiring, FACTORY AUTHORIZED TECHNICIAN to perform start-up, calibration, and safety check, set combustion and operator training. SUNY considers any oral or written information released prior to the issuance of this RFP to be preliminary in nature and will not be bound by such information. During the RFP process, bidders should email the contacts listed above. The terms, conditions and all applicable information required for submitting a bid are outlined throughout this RFP. Bidders must pay strict attention to the bid submission date, time, and location to prevent disqualification. To ensure compliance with the RFP requirements and prevent possible disqualification, bidders must follow the format and instructions as required herein. Failure of bidder to follow instructions may result in disqualification of the bid. Direct all questions by email to Tricia Kandler tkandler@buffalo.edu.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents