Similar Projects
Highpoint
New Construction - 588,000 SF
Conception
Stuart, FL 34997

Watercress Cove
New Construction
Conception
North Port, FL

Drivers Club Miami
New Construction - 209,100 SF
Design
$100,000,000 est. value
Miami Gardens, FL

Nolte Road Commercial Park
New Construction
Design
Saint Cloud, FL 34772

Mechanical Site Prep of Approximately 135 Acres
Bidding
FL

Cordova Palms - Site Only
New Construction
Post-Bid
Saint Augustine, FL

Lamb Tail Lane West Expansion
New Construction
Post-Bid
Jacksonville, FL 32256

Unsolicited Proposal for the Development, Operation and Maintenance of a Soccer Complex and Other Facilities
Results
Miramar, FL

Directional Bore Services - Annual
Term Contract
Results
$300,000 to $400,000 est. value
Fort Myers, FL 33901

Morgan's Cove Assisted Living - Site Work
Construction
$35,000,000 est. value
Saint Augustine, FL

KOA Campground
New Construction
Construction
$3,384,744 est. value
Fort Pierce, FL 34981

11134 New Kings Road RV Park
New Construction
Pending Verification
Jacksonville, FL 32219

Pace Commons
New Construction
Pending Verification
Pace, FL

Waterset By Newland
New Construction
Conception
Apollo Beach, FL 33572

Oviedo on the Park - Lot 4 - Sitework
New Construction
Design
Oviedo, FL 32765

Last Updated 04/08/2021 09:55 AM
Project Title

The Cottages at Heritage Grove Infrastructure

Physical Address View project details and contacts
City, State (County) The Villages, FL 32159   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method
Project Status Construction Commenced November 2020, Construction Completion Expected April 2021
Bids Due View project details and contacts
Estimated Value $733,914
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists generally of water, sewer, roads, and stormwater. The water system improvements generally include providing materials for the installation of 8 PCV water main, valves, fire hydrants, and appurtenances necessary to construct the project. The sewer system improvements generally include providing materials for the installation of 8 PCV gravity main, sewer laterals and appurtenances necessary to construct the project. The stormwater system improvements generally include providing materials for the installation of reinforced concrete pipe, inlets, mitered end sections, manholes, grading of ponds, and appurtenances necessary to construct the project. The roadway improvements generally include providing materials for the installation of asphalt, lime rock, stabilized subgrade, curbs, sidewalk, grading, grassing, signage, striping, landscaping, and appurtenances necessary to construct the project.

Details

Site Development, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Facility Fire Hydrants.
Division 31 - Earthwork, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Sidewalks, Fences and Gates, Irrigation, Irrigation Pumps, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Distribution Valves, Water Utility Distribution Fire Hydrants, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents