Similar Projects
John M. Price District Attorney Building - Replace Carpet Throughout Facility - P000176 - Sacramento County
Alteration
Conception
$868,000 est. value
Sacramento, CA 95814

Electrical, Framing, Mechanical, Flooring,Plumbing, Drywall
Alteration
Design
San Francisco, CA 94128

DCMWTP Chlorine Generation Room Floor Repair
Renovation
Sub-Bidding
$79,000 CJ est. value
San Diego, CA 92101

Laboratory Floor Replacement
Renovation - 8,706 SF
Sub-Bidding
$250,000 CJ est. value
Martinez, CA 94553

Flooring Repair and Installation Services
Alteration
Post-Bid
Roseville, CA

FEMA Region 9 Floor Core Services
Alteration
Post-Bid
Oakland, CA 94607

Oak Park Dance Floor Repair
Alteration
Results
$93,000 est. value
Santa Barbara, CA 93102

Harrison Emergency Shelter Project - Phase 2
Renovation, Alteration
Results
$375,000 to $475,000 est. value
Corona, CA

SHER BLDG PHARM Relocate Pharm Staff from N-S Wings
Renovation - 44,297 SF
Sub-Bidding
$560,000 CJ est. value
Sacramento, CA 95817

Gym Lobby Flooring
Alteration
Post-Bid
San Bernardino, CA 92408

Flooring for Desert Housing
Term Contract
Results
CA

Mperial County Betty Jo Mcneece Receiving Home - Flooring Improvement Project
Renovation
Sub-Bidding
$93,000 CJ est. value
El Centro, CA 92243

Riverside City Hall 4th and 7th Floor Deck Refinishing
Alteration
Post-Bid
Riverside, CA 92501

Gym Floor Refinishing
Term Contract, Alteration
Results
$100,000 est. value
Fremont, CA

Flooring Services - CHP Mission Grade CVEF
Term Contract
Sub-Bidding
Sunol, CA 94586

Last Updated 07/08/2023 02:32 AM
Project Title

Bakersfield High School Warren Hall Modernization Descope Phase 1

Physical Address View project details and contacts
City, State (County) Bakersfield, CA 93304   (Kern County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $153,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

A. Central Plant and required site utilities. B. Cross connection repair and replacement. C. Re-roofing of Warren Hall. D. Accessible Ramps on the west side of Warren Hall. E. Site lighting adjacent the Central Plant and accessible ramps. F. Accessible restrooms for Boys, Girls, and Staff. G. Exterior painting of Warren Hall and Administration. H. Abatement of hazardous materials per report prepared by Forensics Analytical. Addition of ornamental fence/gates to accommodate new improvements. License Requirements C13 or C23 Online Q&A No Liquidated Damages $1,000.00 per calendar day Start/Delivery Date May 15, 2023 Project Duration 457 calendar days as defined in Construction Manager's Construction Schedule Notes Anticipated Award Date is Monday, May 1, 2023 Type of Award Lump Sum

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents