Similar Projects
Davis Road Widening - WT26029 - City of Stockton
Infrastructure
Conception
$4,371,000 est. value
Stockton, CA 95214

Davis Road Widening - WT26029 - City of Stockton
Infrastructure
Conception
$4,371,000 est. value
Stockton, CA 95214

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Operational Improvements
Infrastructure
Design
$17,836,000 est. value
Stockton, CA 95214

A Street South, Area 1 and 2 (topside) Phase 2
Infrastructure
Bidding
$300,000 est. value
Lathrop, CA 95330

COS MUD RWCF Bioscrubber Repairs
Infrastructure
Bidding
$650,000 est. value
CA 95206

A and E On-Call Roadway Construction,District 10
Infrastructure
Post-Bid
$6,425,530 to $10,441,487 est. value

Street Resurfacing On Federal-Aid Streets Fy2020-21
Alteration
Post-Bid
$2,618,546 est. value
Stockton, CA 95206

Brennan Avenue Resurfacing
Infrastructure
Results
$1,140,000 to $1,395,000 est. value
Escalon, CA

South 99 Frontage Road (East) Resurfacing
Infrastructure
Results
$570,000 to $670,000 est. value
Stockton, CA

Aurora Street Over Mormon Slough Bridge - WT22035 - City of Stockton
Alteration
Conception
$347,000 est. value
Stockton, CA 95202

FY 2022-23 Road Maintenance and Rehabilitation
Infrastructure
Bidding
$1,100,000 est. value
Lathrop, CA

Tracy Various Paving
Term Contract, Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value
Tracy, CA 95304

Road Diet On North Eldorado Street, Turn And Bike Lanes
Infrastructure
Results
Stockton, CA 95214

Janet Leigh Plaza Pedestrian Improvements - WC24020 - City of Stockton
Alteration
Conception
$6,677,000 est. value
Stockton, CA 95203

Last Updated 07/19/2022 07:46 AM
Project Title

Pershing Avenue Roadway Crown Reduction - WT26036 - City of Stockton

Physical Address View project details and contacts
City, State (County) Stockton, CA 95214   (San Joaquin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2026
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a mixed-use development in Stockton, California. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot. This project will reduce the existing crowning at intersections along southbound N. Pershing Ave between Princeton Ave and Elmwood Ave. Included with the crown reduction are base repair where needed, pavement grinding and paving, and installation of ADA-compliant ramps and sidewalks. This project is in included in the City of Stockton FY 2023-2027 Capital Improvement Plan (CIP). As of July 18, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents