Similar Projects
WOW Trail - City of Laconia
Infrastructure
Conception
$225,000 CJ est. value
Laconia, NH 03246

WOW Trail - City of Laconia
Infrastructure
Conception
$225,000 CJ est. value
Laconia, NH 03246

The Preserve at Winnisquam
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Tilton, NH 03276

The Preserve at Winnisquam
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Tilton, NH 03276

ARPA - Fire Tower Facilities Upgrades (Belknap/Cardigan)
Infrastructure
Bidding
$1,050,000 CJ est. value
Gilford, NH 03249

RFP D/B - Replacement of Recycling Building
Demolition, New Construction, Infrastructure
Bidding
$150,000 CJ est. value
Alton, NH 03809

Statewide Pavement Markings
Infrastructure
Sub-Bidding
$459,726 CJ est. value
Gilford, NH 03249

Parks and Recreation Patio and Sidewalk Replacement
Infrastructure
Post-Bid
Meredith, NH 03253

Riverwalk Sidewalk Repair Services
Infrastructure
Post-Bid
Laconia, NH

Districts 2 and 3 Resurfacing
Infrastructure
Results
$3,881,637 est. value

Pavement crack seal on 12 section in Districts III, IV and V
Infrastructure
Results
$545,957 est. value

Langley Cove
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Laconia, NH 03246

Langley Cove
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Laconia, NH 03246

Bay Street Apartments / Laconia
New Construction, Infrastructure
Design
$4,600,000 CJ est. value
Laconia, NH 03246

Asphalt Paving Services
Infrastructure
Post-Bid
Meredith, NH

Last Updated 03/14/2023 07:02 AM
Project Title

Replacement of Brick Sidewalks- with Concrete sidewalks- Brick stamped with coloring

Physical Address View project details and contacts
City, State (County) Alton Bay, NH 03810   (Belknap County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $121,875 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Alton, NH is soliciting proposals from qualified contractors interested in providing construction services for replacement of Brick Sidewalks- with Concrete sidewalks- Brick stamped with coloring. General questions, requests for information and responses to this RFP shall be addressed to: Scott Kinmond, CPM Director of Public Works dpwdirector@alton.nh.gov 603-875-6808 - Office The Town of Alton reserves the right to reject any and all submittals. This RFP does not obligate the Town to pay any cost incurred by respondents in the preparation and submission of a response nor does it obligate the Town to accept or contract for any expressed or implied work The Town of Alton, NH is soliciting proposals from qualified contractors interested in providing construction services for replacement of Brick Sidewalks- with Concrete sidewalks- Brick stamped with coloring. Project Scope Location: Alton Bay Railroad Park Waterfront, Mount Major Highway, Alton Bay, NH. Scope of Work The current brick sidewalks which consist of 5,619 square feet of sidewalk. These sidewalks will be removed by the Town's Public Works Department. Granite curbing, which will be reset by others. Town Public Works Staff will establish subgrade gravel, and bring to a rough grade. Sidewalk will need to be fine graded, compacted and formed in accordance with Appendix A. Contractor will begin the preparation and installation of the specified stamped (brick design) concrete with approved coloring, and sealer as specified in Appendix A. Google Maps & Tax Map Appendix B Sketch - Not to Scale Appendix C. The Town's Public Works Department plans to have the current brick sidewalk removed by May 1, 2023, and available for Granite Curbing installation, and upon resetting available to the contractor with a completion date weather dependent of May 25, 2023. The site may become available for a phased installation. Scope of Work o The current brick sidewalks which consist of 5,619 square feet of sidewalk. o These sidewalks will be removed by the Town's Public Works Department. o Granite curbing, which will be reset by others. o Town Public Works Staff will establish subgrade gravel, and bring to a rough grade. o Sidewalk will need to be fine graded, compacted and formed in accordance with Appendix A. o Contractor will begin the preparation and installation of the specified stamped (brick design) concrete with approved coloring, and sealer as specified in Appendix A. o Google Maps & Tax Map Appendix B o Sketch - Not to Scale Appendix C Location: Alton Bay Railroad Park Waterfront, Mount Major Highway, Alton Bay, NH.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents