Similar Projects
2022 Tar and Chip Project
Infrastructure
Design
$30,000 CJ est. value
Parryville, PA 18244

Ready Mixed Concrete and Cement/Concrete Products
Term Contract
Bidding

Ready Mixed Concrete and Cement/Concrete Products
Term Contract
Bidding

Pave in Place Projects
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Hamburg, PA 19526

Concrete New and Replacement
Renovation
Sub-Bidding
$50,000 CJ est. value
Downingtown, PA 19335

Inlet Precast Concrete Galvanized
Alteration
Post-Bid
Everett, PA 15537

Construction of a Sludge Transfer Bed
Alteration
Post-Bid
Brookville, PA

Tyrone Area High School Loading Dock Renovations Project - General Construction
Results
Less than $184,000 est. value
Tyrone, PA 16686

Concrete New and Replacement
Results
Downingtown, PA

Additions & Alterations to Downingtown High School East
Addition, Demolition, New Construction, Renovation, Infrastructure - 65,092 SF
Bidding
$22,900,000 CJ est. value
Exton, PA 19341

Precast Concrete Inlets and Risers
Alteration
Post-Bid
Carnegie, PA

District Wide Masonry and Concrete Repairs
Alteration
Results
$70,000 est. value
Chester, PA

2023 Bridge Maintenance
Infrastructure
Bidding
$283,000 CJ est. value
Elizabethtown, PA 17022

Fairview Hills Concrete Revitalization Project Phase II
Alteration
Post-Bid
Altoona, PA 16601

Main Street Streetscape - Electrical/Concrete
Alteration
Results
$450,000 est. value
PA

Last Updated 03/28/2023 10:09 AM
Project Title

Frey Farm Landfill Maintenance Building Construction

Physical Address View project details and contacts
City, State (County) Conestoga, PA 17516   (Lancaster County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $5,895,273 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

• Kinsley Construction, Inc. was the awarded the contract for General Construction for the FFLF Maintenance Building Construction. The awarded amount was $4,146,969.00. • Shannon A. Smith, Inc. was awarded the contract for HVAC for the FFLF Maintenance Building Construction. The awarded amount was $492,130.00. • Frey Lutz Corp. was awarded the contract for Plumbing for the FFLF Maintenance Building Construction. The awarded amount was $526,705.00. • Edwards Electric & Telecom, Inc. was awarded the contract for Electrical for the FFLF Maintenance Building Construction. The awarded amount was $729,469.00. The Project generally includes: -The installation and construction of an approximately 17,000 sf multi-use maintenance building. The building will include vehicle maintenance, washbay, office and storage areas. The Project will be performed under four (4) separate prime contracts, as follows: Contract 1 - General Construction Contract 2 - HVAC Work Contract 3 - Plumbing Work Contract 4 - Electrical Work Question Deadline 02/23/2023 at 4:00 PM ET Any questions related to this project should be directed to the Engineer, Mr. Benjamin I. Fichtner, P.E., in writing at benf@proveng.com. Mr. Robert C. Burke shall be copied on all questions submitted to the Engineer Contract No.: FFLF2023-3 FFLF2023-3-1 FFLF2023-3-3 FFLF2023-3-2 All questions must be submitted by February 23, 2023, at 4:00 PM POC. NO: 6331514 Each Bid must be accompanied by a certified check, bank cashier's check, or bid bond in the amount of 10% of the Bid total. No Bid may be withdrawn within sixty (60) days after Bid opening, and the Owner shall award a contract or reject all Bids on or before such sixty (60) day period. It is the Owner's intent to begin construction at the earliest possible date after award of a contract. The Owner reserves the right, which is understood and agreed to by all Bidders, to reject any and all Bids and to waive any omissions, errors, mistakes, defects, or irregularities in any Bid at its sole discretion. Any questions related to this project should be directed to the Engineer, Mr. Benjamin I. Fichtner, P.E., in writing at benf@proveng.com. "Please note, we require that potential bidders contact LCSWMA directly to receive an official copy of the project plans." Bid Result General Construction Kinsley Construction, Inc $4,146,969 HVAC Shannon A. Smith, Inc $492,130. Plumbing Frey Lutz Corp. 526,705.0

Details

17,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents