Similar Projects
Spec Suite -5151 Katy Freeway building
Renovation - 1,967 SF
Design
$244,099 est. value
Katy, TX 77007

Third Storm Water Pump Station Bid Package No. 4A - Concrete Paving
Infrastructure
Bidding
$120,000 to $190,000 est. value
Sugar Land, TX 77479

Paving and Appurtenances to Serve Bryan Grove Section 1
Infrastructure
Bidding
$800,000 est. value
Rosenberg, TX

Engineering Services Design and Project Management Primrose Park - Phase 2
Post-Bid
$1,000,000 est. value
Fulshear, TX

Paving, Drainage, and Pedestrian Improvements for Trinity Drive - from Greenbriar Drive to 400 LF North of Bluebonnet Drive
Post-Bid
Stafford, TX 77477

City of Stafford General Street Repairs
Results
Stafford, TX 77477

Mason Road and Jack Road Street Dedication Section 1
Results
Less than $3,497,077 est. value
Katy, TX

Harmony School Of Excellence - Ground-Up Project - Katy
New Construction - 107,000 SF
Construction
$12,000,000 est. value
Katy, TX

2022 Street Repair of Chihuahua Street and River Road. Intersection, and Preservation of Lauren Court, Hillcrest Drive, and Kyle Street
Infrastructure
Bidding
$700,000 est. value
La Vernia, TX

Paving Facilities in Candela Section 8
Infrastructure
Post-Bid
$420,000 est. value
TX

Bamore Road Expansion (I-69 to Stella Road)
Results
Rosenberg, TX

Paving and Appurtenances to Serve Sienna Section 55
Infrastructure
Bidding
$2,000,000 est. value
Richmond, TX

Road Construction Improvements On Front Street for Fort Bend County Mobility Bond Project
Infrastructure
Post-Bid
Richmond, TX 77469

Construction on Brandt Road from McCrary Road to Precinct Line Road Phase I
Results
Less than $1,698,735 est. value
Richmond, TX 77406

Beckendorff Road Sec 3 Water, Paving, and Drainage
Infrastructure
Bidding
$4,160,000 est. value
Katy, TX 77493

Last Updated 07/12/2022 03:51 AM
Project Title

Construction of Right Turn Lane for West Bellfort at SH 99

Physical Address View project details and contacts
City, State (County) Richmond, TX 77406   (Fort Bend County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. The scope of work for the above project includes removal of existing concrete pavement, curb, driveway, pedestrian ramps, pedestrian pole, roadway signs and pavement markings. 2. The scope includes proposing a 12’ right turn lane from westbound W Bellfort Road to SH 99 (Grand Parkway) northbound frontage road. The proposed roadway section is composed of 13” fast track concrete pavement. 3. The scope includes the installation of 24” reinforced concrete pipes and Type C and Type C-2 inlets. 4. The scope also includes the installation of type 7 pedestrian ramps, sidewalk, median adjustment, and modification of the existing signal on the northeast corner to include additional pedestrian push buttons and pedestrian signal heads. 5. Traffic Control, permanent signing and striping, and storm water pollution prevention is also included as part of the scope for this project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents