Similar Projects
Avenue 5E, Water and Sewer Extension - 0036-SEWER5 - City of Yuma
Infrastructure
Conception
$2,000,000 CJ est. value
Yuma Proving Ground, AZ 85365

40th Street Paving, Arizona Avenue to Avenue A - 0430-ROAD22 - City of Yuma
Infrastructure
Conception
$1,225,000 CJ est. value
Yuma, AZ 85364

Main Street Water Treatment Plant Basin 1 and 2 Renovations - 0037-WATER8 - City of Yuma
Infrastructure
Design
$1,350,000 CJ est. value
Yuma, AZ 85364

36th Street Water Main Extension - 0043-WATER - City Of Yuma
Infrastructure
Design
$250,000 CJ est. value
Yuma Proving Ground, AZ 85365

Somerton Heights Waterline and Street Improvements Project
Infrastructure
Bidding
$800,000 CJ est. value
Somerton, AZ 85350

Somerton Heights Waterline and Street Improvements Project
Infrastructure
Bidding
$800,000 CJ est. value
Somerton, AZ 85350

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

AZ FLAP 202(2) Red Cloud Mine Road
Results
$1,500,000 to $2,500,000 est. value
Yuma, AZ

Arizona Avenue Paving, Palo Verde to Country Club
Results
Yuma, AZ 85365

Smucker Regional Basin - 0013-STORM - City Of Yuma
Infrastructure
Pending Verification
$300,000 CJ est. value
Yuma, AZ 85364

La Vida Seca Subdivision
New Construction, Infrastructure
Pending Verification
$70,826,024 CJ est. value
Yuma Proving Ground, AZ 85365

Triple S Industrial Park Paving - 0430-ROAD11 - City of Yuma
Infrastructure
Conception
$675,000 CJ est. value
Yuma, AZ 85364

Arizona Avenue Waterline Replacement - 10th Street to 15th Street - 0121-WATER8 - City of Yuma
Infrastructure
Design
$350,000 CJ est. value
Yuma Proving Ground, AZ 85365

Street Sweeping Services (FY2122)
Term Contract
Post-Bid
Yuma, AZ 85364

Last Updated 09/13/2022 07:34 AM
Project Title

Yuma - Casa Grande Highway (I-8) (Wellton - Ave 36E)

Physical Address View project details and contacts
City, State (County) Wellton, AZ 85356   (Yuma County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $8,078,317 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Tracs No: 008 YU 029 F045601C Project No: 008-A-NFA Termini: Yuma-casa Grande Highway (I-8) Location: Wellton to Ave 36e Route No. Milepost District Item No. I-8 29.00 to 37.09 Southwest 102787 The amount programmed for this contract is $10,800,000. The location and description of the proposed work are as follows: The proposed project is located in Yuma County on Interstate 8 between mileposts 29.00 and 37.09 near Yuma. The proposed work consists of removing the existing asphaltic concrete surface course by milling and replacing it with a Bonded Wearing Course overlay in the westbound direction and Stone Matrix Asphaltic concrete in the eastbound direction. The project also includes spot repair work by milling and replacing with asphaltic concrete in the westbound direction. Additional work includes replacing pavement markings and other miscellaneous work. The time allowed for the completion of the work included in this contract will be 85 working days. The Arizona Department of Transportation, in Accordance With the Provisions of Title Vi of the Civil Rights Act of 1964 (78 Stat. 252.42 U.s.c. 2000d-4) and the Regulations, Hereby Notifies All Bidders That It Will Affirmatively Ensure That Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full and Fair Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, or National Origin in Consideration for an Award. This Contract Is Subject to the Provisions of Arizona Revised Statutes Section 42-5075 -- Prime Contracting Classification; Exemptions; Definitions. No Award Will Be Made to Any Contractor Who Is Not a Duly Licensed Contractor in Accordance With Arizona Revised Statutes 32-1101 Through 32-1170.03. All Labor Employed on This Project Shall Be Paid in Accordance With the Minimum Wage Rates Shown in the General Wage Decision. These Rates Have Been Determined in Accordance With the Requirements of the Law and Issued by the Secretary of Labor for This Project. The Wage Scale Is on File in Contracts and Specifications Section and Copies May Be Obtained at All Reasonable Times. A Proposal Guaranty in the Form of Either a Certified or a Cashier's Check Made Payable to the State Treasurer of Arizona for Not Less Than 10 Percent of the Amount of the Bid or in the Form of a Surety (Bid) Bond for 10 Percent of the Amount of the Bid Shall Accompany the Proposal. Surety (Bid) Bonds Will Be Accepted Only on the Form Provided by the Department and Only From Corporate Sureties Authorized to Do Business in Arizona. Questions and Comments Concerning the Bid Package for This Project Shall Be Directed to the Individuals Noted Below: Iqbal Hossain, P.e. Group Manager Contracts & Specification AZDOT - Yuma - Casa Grande Highway (I-8) (Wellton - Ave 36E)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents