Similar Projects
Last Updated | 08/19/2020 10:06 AM |
Project Title | Cordtlandt Waterfront Park Sea Plane Hanger Reconstruction |
Physical Address | View project details and contacts |
City, State (County) | Verplanck, NY (Westchester County) |
Category(s) | Transportation |
Sub-Category(s) | Aircraft Hangar |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Removing and disposing the existing foundations and concrete slab and erecting a new pre-fabricated metal building (as shown on the contract drawings), including all excavation for the foundation, installation of cast in place concrete slab, equipping the building interior with electric, exterior concrete walkways, installing and maintaining sediment and erosion controls, installing a infiltration trench with associated piping. Existing metal building shall be removed and disposed of by others, existing concrete slab and footings are to be removed and disposed of by contractor awarded the project. |
||||||||||||||||
Details |
|
||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |