Similar Projects
St. Francis Barracks Seawall, Shoreline Erosion Protection, CAP Section 14
Term Contract
Design
$1,000,000 to $5,000,000 est. value

Culvert Pipe Replacement - Port Malabar Country Club Units 01-10
Infrastructure
Bidding
$786,698 est. value
Palm Bay, FL

Grant Place Baffle Box
Infrastructure
Bidding
Melbourne, FL

Stormwater Pond Bulkhead Improvements
Post-Bid
FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Lift Station F04 Seawall Replacement
Results
$45,000 est. value
Merritt Island, FL 32940

Culvert Pipe Replacement - Units 24 and 25
Results
Less than $1,295,000 est. value
Palm Bay, FL 32907

Lori Laine Trunkline Replacement
Infrastructure
Bidding
Satellite Beach, FL

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Dredged Material Management Area BV-11 Construction
Results
$1,000,000 to $5,000,000 est. value
FL

Gramling Park Drainage Improvements
Infrastructure
Post-Bid
Melbourne, FL 32901

Desilt and Video and Pipe Lining
Results
Less than $600,000 est. value

Golf Course Lake Bank Restoration
Infrastructure
Post-Bid
Barefoot Bay, FL

Drainage Repair
Results
Less than $300,000 est. value
FL

Culvert Pipe Replacement - Units 2, 3, 4, 43, and 47
Results
Less than $332,362 est. value
Palm Bay, FL 32907

Last Updated 11/02/2021 11:20 AM
Project Title

CS-1 Sliplining (Fellsmere Grade)

Physical Address View project details and contacts
City, State (County) Palm Bay, FL   (Brevard County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall install a continuous length of HDPE pipelining sleeves (63" O.D. HDPE DR 32.5 solid wall pipe with heat fused joints) into two (2) 100-foot x 72-inch existing corrugated metal culverts (as-built drawings attached). The cost shall cover mobilization/demobilization, labor, equipment, transportation, cleaning of existing pipes and installation/grouting of the HDPE pipe. In addition, the contractor shall retrofit existing gates to new pipes, repair gate brackets and operating cable brackets as necessary to ensure a tight seal and continued operation of the gates.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents