Similar Projects
Conveyance System Infrastructure Improvements
Infrastructure
Bidding
Detroit, MI

Lowell Area School Alto Well Replacement
Infrastructure
Bidding
$108,000 est. value
Lowell, MI

OTT Story Superfund Site Operable Unit #2 Groundwater Remedy - Phase I
New Construction
Post-Bid
$5,000,000 to $10,000,000 est. value
Muskegon, MI

Springfield Oaks New Well Project
Post-Bid
Davisburg, MI 48350

Water Well and Yard Hydrant Installation
Results
Rochester, MI 48306

Construction and Development of New Private Water Well
Results
Clare, MI

4-Inch Dri-Prime Pump
Infrastructure
Bidding
Pontiac, MI

Z--SLBE - Empire Water Renovation
Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value
Empire, MI

Type 1 Water Supply Well 12
Results
Saint Louis, MI

Prequalification for the Services of Plugging, Drilling, Re-drilling and Site Restoration of Oil and Gas Wells
Infrastructure
Bidding
Lansing, MI

2021 Six-Inch (6") Trailer Mounted Centrifugal Trash Pump Purchase
Post-Bid
Mount Pleasant, MI

USDA Water System Improvements
Results
Roscommon, MI

Bid Package 15 - Baldwin Elementary School Well Equipment, Electrical, and Site Lighting
Infrastructure, Alteration
Bidding
$220,000 est. value
Rochester, MI 48306

2016 Bond Projects - Bailey Lake Elementary Well System Improvements
Post-Bid
Clarkston, MI 48348

Palmer 3 Well Field Rehabilitation
Results
Owosso, MI 48867

Reported 04/13/2022 12:00 AM
Project Title

Baldwin Lake Grinder Pump Replacement

Physical Address View project details and contacts
City, State (County) Greenville, MI   (Montcalm County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Greenville installed a low-head pressure sewer system around Baldwin Lake in 1986-1987. At that time each address received an E-One grinder pump on their property with a control panel mounted on or near their house. Additional addresses have been added since that time. Currently there are approximately 110 units on the system

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents