Similar Projects
Brookfield Square Mall
New Construction, Demolition, Infrastructure - 600,000 SF
Design
$81,000,000 est. value
Elm Grove, WI 53122

Spring Creek Church Teen Center
Addition, Demolition, Infrastructure - 10,660 SF
Design
$3,500,000 CJ est. value
Pewaukee, WI 53072

CTH B; Intersection with Morgan Road
Infrastructure
Bidding
$500,000 CJ est. value
Oconomowoc, WI 53066

CTH B; Intersection with Morgan Road
Infrastructure
Bidding
$500,000 CJ est. value
Oconomowoc, WI 53066

Roberta And Dopp Park Ball Diamond Fencing
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Waukesha, WI 53186

2021 Road Program
Post-Bid
Brookfield, WI 53045

2021 Road Improvement Program
Post-Bid
Delafield, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Perkins Avenue Utility and Street Improvements
Results
Waukesha, WI 53186

STH 16, 5,800' West of STH 83 STH 190
Infrastructure
Bidding
$2,000,000 CJ est. value
Nashotah, WI 53058

Town Hall Drive Reconditioning
Renovation
Post-Bid
Eagle, WI

Oxford Road, Downing Drive, Algoma Terrace, Rawlins Drive and Badger Drive Utility and Street Improvements
Results
Waukesha, WI 53186

Pewaukee - Milwaukee, Pilgrim Road / Capitol Drive, B-67-0086
Infrastructure
Bidding
$499,999 CJ est. value
Brookfield, WI 53045

Asphalt Concrete Paving - County Highway System
Infrastructure
Post-Bid
WI

2021 Local Road Maintenance
Results
WI

Last Updated 07/28/2022 12:02 AM
Project Title

2022 Crack Fill and Striping Projects

Physical Address View project details and contacts
City, State (County) Waukesha, WI 53186   (Waukesha County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Crack Filling - The Contractor's Work under this Contract shall include all labor, materials, tools, equipment and related items necessary to install crack fill as shown on the Drawings and as specified herein. This Work includes cleaning, drying and filling the longitudinal and transverse cracks in asphaltic pavement. Crack filling shall take place prior to striping. Striping - The Contractor's Work under this Contract shall consist of furnishing all labor, materials and equipment necessary for pavement striping and marking as herein specified and for the sections shown on attached Drawings and as per State of Wisconsin Department of Transportation Standard Specifications for Highway and Structure Construction Section 646. Striping of roads includes all pavement markings on designated section and may include center lines, stop lines, direction arrows, parking lot stalls, accessible stall, hatching, curb markings and pavement lettering. Striping of parking lots includes all pavement markings on designated section and may include stop lines, parking lot stalls, accessible stalls, hatching, curb markings and pavement lettering. All pavement marking shall comply with Waukesha County standard paving colors unless directed by the County Landscape Architect. Standard Colors: Parking Lot Stall Lines - white, Accessible Symbols - blue and white, Parking Lot Hatching - white, Directional Arrows - white, Pavement Lettering - white, Park Crosswalk Bar - reflective white paint, Center Lines - bright yellow, Curb Marking (no parking) - bright yellow, Trail Crossings Crosswalk Bar - white epoxy. Bid Bond 10% The right to reject any or all Bids, either in whole or in part, or to waive any informalities or irregularities is reserved by Waukesha County.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Painted Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents