Similar Projects
Howard Street Phase 2, Cleveland Park Area Waterline Rehabilitation Project
Post-Bid
Spartanburg, SC 29301

Clem's Brand/Sugar Creek Interceptor Phase III
Post-Bid
SC

East Main Street at South Anderson Road Waterline
Results
Rock Hill, SC

Replacement of All Existing Waterlines and Meters
Results
Less than $2,859,092 est. value
Bethune, SC 29009

Water Sewer System Improvements - Connelly Road - 6" Main
Post-Bid
Pickens, SC

Ehrenclou Drive Water and Sewer Line Extensions
Results
Less than $199,038 est. value
Camden, SC 29020

Joanna Waterline Improvements
Post-Bid
SC

Highway 327 and Highway 57 Water Line Relocation
Results
Florence, SC

Highway 72 Distribution Main
Post-Bid
SC

Kitson Street/Lowell Avenue 6-Inch Water Main Replacement
Results
Less than $505,400 est. value
Greenwood, SC 29648

Creekview Drinking Water Distribution Rehabilitation Project
Post-Bid
$150,000 to $200,000 est. value
Clemson, SC

Energy Savings Performance Services
Term Contract
Results
Columbia, Eastover, Hopkins, SC 29209

Kaolin Road Waterline Improvements
Post-Bid
Aiken, SC 29801

6", 8", 12" and 18" Water Main Upgrades Along Trenholm Road
Results
Columbia, SC

Berkeley County Master Meter
Post-Bid
SC

Last Updated 11/15/2019 04:10 PM
Project Title

Calhoun Avenue 12-Inch Water Main Replacement

Physical Address View project details and contacts
City, State (County) Greenwood, SC   (Greenwood County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $486,218
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Upgrade approximately 1,500 feet an 85+ year old 12-inch cast iron water line with new 12-inch ductile iron pipe (DIP). This waterline includes 16 service taps and impacts a number of commercial establishments, including the main feed to Lander University Campus and the main feed to uptown Greenwood. The line extends parallel to Calhoun Avenue, from the intersection of Highland Park Drive to the intersection with Lander Street. The project is within SCDOT right-of-way. The majority of the construction will be located under the sidewalk, with small portions under the roadway.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents