Similar Projects
Winter Springs Self-Storage
New Construction - 70,675 SF
Conception
Winter Springs, FL 32708

Fastenal Warehouse and Office
New Construction - 142,200 SF
Conception
Sanford, FL 32773

Brotz Office-Warehouse
New Construction
Design
Geneva, FL 32732

Rinehart Greenway Commons Master Plan
New Construction
Design
Sanford, FL 32771

1690 Fitzpatrick Point Warehouse Renovation
Renovation
Results
Less than $542,273 est. value
Sanford, FL 32771

Del-Air Warehouses
New Construction - 86,000 SF
Construction
$1,435,459 est. value
Sanford, FL 32771

Chris Johnson Warehouses
New Construction - 37,380 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Oviedo, FL 32762

Terra Firma Auto Group
New Construction - 14,708 SF
Design
Sanford, FL 32773

JDA Self-Storage Lockwood
New Construction - 94,000 SF
Construction
Oviedo, FL 32765

Nestle Waters Casselberry Facility Expansion
New Construction, Addition - 8,387 SF
Design
$1,000,000 est. value
Casselberry, FL 32707

Infotainment Center
New Construction - 33,492 SF
Construction
$3,163,303 est. value
Oviedo, FL 32765

Marsden Office-Warehouse Building
New Construction, Renovation - 5,000 SF
Design
Fern Park, FL 32730

Axios Mixed-Use Building
New Construction - 29,266 SF
Construction
$3,560,000 est. value
Casselberry, FL 32730

Marine Fasteners Warehouse
New Construction - 113,150 SF
Design
Sanford, FL 32771

Traffic Control Products Warehouse
New Construction - 7,800 SF
Construction
$858,585 est. value
Sanford, FL 32773

Last Updated 10/24/2019 10:09 AM
Project Title

Mayfair Country Club Storage Facility Rehabilitation

Physical Address View project details and contacts
City, State (County) Sanford, FL 32773   (Seminole County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $195,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The Work includes: demolition and reconstruction of a portion off the site storage building, to include but not limited to: demolition of walls and concrete, grading and reconstruction of concrete slabs, concrete block walls, roofing, electrical, site work, drainage, along with other appurtenant work necessary to complete the project for use.
Details
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents