Similar Projects
Pardeeville - Manchester Const/ Mill and Overlay
Infrastructure
Conception
$3,000,000 CJ est. value
Ripon, WI 54971

Pardeeville - Manchester Const/ Mill and Overlay
Infrastructure
Conception
$3,000,000 CJ est. value
Ripon, WI 54971

USH 45, City of Fond Du Lac Ex-jt Payment 7 of 11 FY23
Infrastructure
Design
$750,000 to $1,000,000 est. value
Fond du Lac, WI

Summit Automotive Vehicle Service and Repair
New Construction, Infrastructure - 11,485 SF
Design
$2,500,000 CJ est. value
Fond du Lac, WI 54937

Construct Unit Storage Building
New Construction, Infrastructure
Bidding
$196,000 CJ est. value
Fond du Lac, WI 54935

Construct Unit Storage Building Fond Du Lac Armory
Infrastructure, Renovation - 1,620 SF
Bidding
$196,000 CJ est. value
Fond du Lac, WI 54935

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Transit Development Plan 2022
Term Contract
Post-Bid
Fond du Lac, WI

Road Cold Mix Wedging & Hot Oil Chip Sealing
Infrastructure
Results
Waupun, WI

Epoxy Pavement Markings - STH/USH, Locations on STN Per Annual Plan
Infrastructure
Results

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Froedtert Health and ThedaCare
New Construction, Infrastructure - 18,000 SF
Pending Verification
$35,000,000 CJ est. value
Fond du Lac, WI 54935

Pardeeville - Manchester Const/ Structure Replacement
Infrastructure
Conception
$1,000,000 CJ est. value
Ripon, WI 54971

Aurora Medical Center Fond du Lac
Addition, New Construction, Infrastructure - 70,000 SF
Design
$67,000,000 CJ est. value
Fond du Lac, WI 54937

Last Updated 06/03/2023 06:35 AM
Project Title

2023 Doty Street and Hamilton Place Reconstruction

Physical Address View project details and contacts
City, State (County) Fond du Lac, WI 54935   (Fond du Lac County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Agency's Affiliate - 03/08/23
Owner View project details and contacts
Architect View project details and contacts
Description

As of 03/09/2023 They pulled this project out, was postponed due to they are working on Design and no new schedule yet. Reconstruction of sanitary/storm sewer main and laterals, water main and laterals, curb, gutter, sidewalk, lighting installation, restoration, and pavement Pre-Qualification: Yes

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents