Similar Projects
CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Sewer Rehabilitation
Infrastructure
Bidding
El Cerrito, CA

SLCWD Sewer Infrastructure Replacement and Repair Project
Infrastructure
Bidding
$1,400,000 to $1,600,000 est. value
CA

2018-2019 Sewer Replacement
Infrastructure
Post-Bid
$442,200 est. value
Modesto, CA

River Trunk Realignment Gravity System Project
Infrastructure
Post-Bid
$24,970,000 est. value
Modesto, CA

CIPP Fiberglass Pipe Lining
Infrastructure
Results
Sacramento, CA

Cast Iron Sewer Replacement FY 2020-2021 Package IV
Infrastructure
Results
$716,790 est. value
San Jose, CA

Kern River RD Toilet Site Work Project, Sequoia National Forest
Alteration
Design
$250,000 to $500,000 est. value
CA

Trenchless Sewer Line Pipe Bursting, Repair and Replacement Service
Term Contract
Bidding
Less than $100,000 est. value
Sunnyvale, CA

As-Needed Sewer Cleaning and Inspection (Fy22)
Infrastructure
Post-Bid
$1,400,000 est. value
San Francisco, CA

Miscellaneous Sanitary Sewer Repairs FY 20-21 (Package III)
Infrastructure
Results
$700,001 to $800,000 est. value
San Jose, CA

Center Greens Sanitary Sewer Improvements
Term Contract
Bidding
Anaheim, CA

2022 Sewer Lateral Replacement Project
Infrastructure
Post-Bid
$175,000 to $225,000 est. value
San Carlos, CA

Sanitary Sewer Rehabilitation (Sub-Basin 85-202)
Alteration
Results
$5,900,000 est. value
Oakland, CA

Reported 03/04/2022 12:00 AM
Project Title

Sewer Improvement

Physical Address View project details and contacts
City, State (County) Tiburon, CA   (Marin County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $2,950,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the furnishing of all labor, materials and equipment for the construction of the sewer improvements project, including internal televising of sewer mains and laterals, excavation, pipebursting, open cut excavation and pipe replacement, spot repairs, new manholes, CCTV, rehabilitation and reconnection of sewer laterals, disposals of asbestos cement pipe if removed, backfill, AC paving and surface restoration, together with all appurtenances, connections and testing, for the completed and operational project

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents