Similar Projects
Steam Condensate System Modifications, Illick Hall
Alteration
Bidding
$550,000 est. value
Syracuse, NY 13210

Partially Rebuild North and South Cooling Towers
Alteration
Bidding
$600,000 est. value
Syracuse, NY 13210

Z1DA--528A7-18-720 COVID-19: REPLACE AHU 04, 06, 22, 34, 36
Post-Bid
$2,000,000 to $5,000,000 est. value
Syracuse, NY 13210

Exhaust Duct and Dryer Vent Cleaning Services
Post-Bid
Syracuse, NY 13210

HVAC Inspection and Repair Services
Term Contract
Results
Syracuse, NY

Furnish HVAC Filters as Specified
Term Contract
Results
NY

Upgrade Freight and Passenger Elevators, CAB - HVAC
Alteration
Bidding
$25,000 to $50,000 est. value
Syracuse, NY 13210

J041--Cooling Tower Fill Service for Syracuse VA 528A7 VHA Directive 1193
Term Contract
Post-Bid
Syracuse, NY 13210

Medical Library HVAC Modifications
Alteration
Results
Syracuse, NY 13210

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

University Hospital AIIR Adult ED Ventilation Upgrade
Alteration
Results
Syracuse, NY 13210

HVAC Air Filters
Term Contract
Post-Bid
Syracuse, NY

Rehabilitate 4th Floor HVAC - Bray Hall at SUNY ESF
Alteration
Results
$2,500,000 to $5,000,000 est. value
Syracuse, NY 13210

HVAC
Alteration
Post-Bid

IHP/NRB Steam Line Cross Connect
Alteration
Results
Syracuse, NY

Last Updated 05/23/2022 11:15 PM
Project Title

2021 Capital Improvement Project Phase 1 - HVAC

Physical Address View project details and contacts
City, State (County) Camillus, NY   (Onondaga County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a mixed-use development in Camillus, New York. Completed plans call for the renovation of a educational facility. Split Rock Elementary SED # 42-01-01-06-0-005-010 Camillus Middle School SED # 42-01-01-06-0-012-010 West Genesee High School SED # 42-01-01-06-0-007-013 Public Restrooms/ Storage Building SED # 42-01-01-06-7-015-002 Pressbox at HS Turf SED # 42-01-01-06-7-016-002 Locker Rooms/ Storage Building SED # 42-01-01-06-7-018-002 Contract documents will be delivered via UPS Ground service upon request and receipt of an additional non-refundable delivery and handling charge of $80 per set, payable by separate check to Plan and Print Systems, Inc. All requests for delivery to locations outside of Upstate NY will incur an additional shipping charge based on the metering increase for those locations. Any sets required in excess of the above-mentioned maximums are to be obtained directly by interested parties at the full cost of printing, at their cost, directly from Plan and Print Systems. Only complete sets will be issued. At the time the order is placed, plan holder shall advise Plan and Print Systems of status as to prime bidder, subcontractor, or material supplier and to trade affiliation. Postal address, telephone number, fax number, and email will also be required. Upon returning sets promptly and in re-usable condition to Plan and Print Systems, Inc. within 30 days after the date of the Bid opening, deposits will be refunded as follows: l. Any Bidder will be refunded his or her deposit in full. 2. All other persons receiving any or all the Contract Documents, including Subcontractors and Material Suppliers, will be refunded their deposit in full. All Contract Documents received (except for Documents held by Successful Bidders) must be returned to Plan and Print Systems, Inc., at the above address. For Contract Documents which are not returned to the printer within this 30 day period, deposits will NOT be refunded. The Owner reserves the right to waive any informality in or to reject any or all Bids. Each Bidder must deposit with its Bid, security in an amount and form subject to the conditions provided in the Contract Documents. Requests for interpretation, information or clarification (RFI) of the Contract Documents must be made in writing to King + King Architects and Watchdog Building Partners.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents