Similar Projects
Orchard Estates
New Construction
Conception
Randolph, MA

Pleasant Street Subdivision
New Construction
Conception
Brockton, MA 02301

Maple Hill
New Construction
Design
Franklin, MA 02038

Broadway Office and Parking Lot
New Construction, Renovation
Design
Taunton, MA

Land Clearing Management
Bidding
Hanscom A F B, MA

Constructing One Infiltration Basin
Bidding
$93,160 est. value
Franklin, MA

Sitework and Accessibility Improvements at Fitchburg State University, Mara Village Residential Complex
Post-Bid
Less than $300,000 est. value
Boston, MA 02210

Campsite Restoration in DCR Campgrounds, Western Mass
Post-Bid
Less than $1,000,000 est. value
Pittsfield, MA 01201

Z--Robert Gould Shaw Memorial
Results
$1,000,000 to $5,000,000 est. value
Boston, MA 02108

City-wide Excavation/Construction Services
Term Contract
Results
Less than $450,000 est. value
Chicopee, MA 01021

Centro Las Americas Offices Parking Lot
Renovation - 5,304 SF
Construction
Worcester, MA 01608

Belcher Road Subdivision
New Construction
Construction
Foxborough, MA 02035

Linden Street Apartments
New Construction
Pending Verification
Allston, MA 02134

Turnpike Street Solar
New Construction
Pending Verification
Stoughton, MA 02072

Augusta Avenue and Prospect Street Subdivision
New Construction
Conception
Brockton, MA 02301

Reported 01/06/2021 12:00 AM
Project Title

Southampton Street Yard Watermain Replacement and Parking Lot Repaving

Physical Address View project details and contacts
City, State (County) Boston, MA   (Suffolk County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

1. Replace existing water mains with new High-Density Polypropylene piping sized to meet the current flow requirements to comply with the NFPA and local fire code requirements for the fire safety and the required FDA potable water supply pressure. 2. Install new Fire Hydrants and replace existing (all the new hydrants will be installed with cathodic protection anodes). 3. Perform final pipe connections in each building. 4. Replace old degrading backflow preventers and install new backflows in the buildings that do not currently have them. 5. Repaving and concrete repairs will be performed accordingly at the areas where trenching is required. 6. The existing parking lot will be repaved, grinding off the top-coat and repairing the pot-holes and resurfacing the black top to eliminate the trip hazards and water pooling. 7. Water main installation in this phase consists of all the water mains from the Meter pit to all the yard buildings except the water main to the High-Speed Rail Building. 8. The Car Wash’s existing water meter is in a remote location and requires driving and track protection for servicing it or shutting the valve. It will be relocated within the immediate car Wash Building area for faster and safer access. Also, a new Fire Hydrant will be installed by the Car Wash to meet the NFPA and fire code.

Details

Site Development.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents