Similar Projects
Heat Treat Services
Bidding
CO

HVAC-CRAC ReAcq Synopsis
Post-Bid
$50,000 to $9,990,000 est. value
Colorado Springs, CO 80914

Replace Rooftop Air Condenser Unit
Post-Bid
Colorado Springs, CO

Sustain Repair Air Handler Units - West Fairchild Hall
Results
$1,000,000 to $5,000,000 est. value
Black Forest, CO 80840

Repair HVAC Harmon Hall Arnold Hall
Results
$1,000,000 to $5,000,000 est. value
Colorado Springs, CO 80840

Building 1840 Computer Room Air Conditioner (CRAC) Replacement
Post-Bid
Colorado Springs, CO 80916

Cooling Tower Repairs and Renovations
Results
Less than $50,000 est. value
Colorado Springs, CO 80906

Infrastructure projects at the Southwest Memorial Hospital
Post-Bid
Cortez, CO 81321

CM Engineering and Applied Science Building Chiller Plant Upgrades
Results
Colorado Springs, CO 80918

Pioneers Museum Offsite Storage HVAC Upgrade
Post-Bid
Colorado Springs, CO 80903

Centennial Hall HVAC Upgrade
Results
Colorado Springs, CO

Improvements to the HVAC System Windows and Indoor Air Quality Berg Building
Post-Bid
Less than $1,417,414 est. value
Colorado Springs, CO 80900

Blast Booth, Media Reclaim System, and Dust Collection System Cleaning
Results
Colorado Springs, CO 80914

Hoods & Ducts Cleaning, Peterson AFB
Post-Bid
Colorado Springs, CO 80914

Repair Chemical Feeders for Heating and Chilled Water Systems
Results
Colorado Springs, CO 80914

Reported 01/22/2020 12:00 AM
Project Title

HVAC - CRAC Re-Acq

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80916   (El Paso County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Original Set Aside: 8(a) Set-Aside (FAR 19.8). The Contractor shall provide non-personal services, supervision, tools, materials, and equipment, unless otherwise specified as government-furnished to maintain, upgrade, repair and operate 1) All electrical, Heating, Ventilation, and Air Conditioning (HVAC), Computer Room Air Conditioning (CRAC) Units, and limited support of Uninterruptible Power Supply (UPS) systems located in Building 2 at Peterson Air Force Base (PAFB), 2) HVAC, electrical systems, CRAC, and Power Distribution System (PDS) located at Building 1844 at PAFB, and 3) all CRAC units located at multiple buildings at PAFB. Individual task orders will be issued for each building as needed and for certain routine and emergency repairs. See Attachments 3-5 for a list of equipment located in each potential building (Attachments 3-5 are for informational purposes only to show the magnitude of potential work and may vary by individual task order).

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents