Similar Projects
30 Market St. Sewer Relocation
Post-Bid
$340,000 est. value
Concord, NC

Starvalley 7141 Storm Drainage Improvement Project
Post-Bid
$1,899,563 est. value
Charlotte, NC

2018 Golden LEAF Disaster Recovery Project Contract No. 2 - Sanitary Sewer and Storm Sewer
Results
Parmele, NC

Catch Basin Top
Results
Greensboro, NC 27402

FY 21 Storm Water Maintenance Contract
Post-Bid
Indian Trail, NC

Eaglewood Storm Drainage Improvement
Results
Less than $2,749,000 est. value
Charlotte, NC

Replace Stormwater Line C Street
Post-Bid
$250,000 to $500,000 est. value
Cherry Point, NC 28533

Storm Water Repair and Improvement FY 2021-B
Results
Less than $4,289,180 est. value
Charlotte, NC 28202

Storm Water Maintenance
Infrastructure
Post-Bid
High Point, NC

Storm Water Repair and Improvement FY2021-C
Results
Less than $4,289,180 est. value
Charlotte, NC 28202

North Front Street Streetscape and Utilities Improvements
Infrastructure
Post-Bid
Wilmington, NC 28401

Fy21 Water Replacement - Contract 1
Results
Less than $2,800,000 est. value
Charlotte, NC

Eden Remediation Program, Contract III Bridge Street Basin, Rehabilitation and Replacement
Infrastructure
Post-Bid
Eden, NC

Mcmullen Creek Basin Rehabilitation
Results
$9,000,000 est. value
Charlotte, NC

Fy 22 Storm Water Maintenance
Infrastructure
Post-Bid
Indian Trail, NC

Reported 04/27/2022 12:00 AM
Project Title

2022 Stormwater On-Call Repair Contract

Physical Address View project details and contacts
City, State (County) Greenville, NC   (Pitt County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

All work under this contract will be issued to the Contractor as task orders and will identify a specific scope of work for each individual site location. The contract work may include, but is not limited to, cured in place or spin-cast lining, repair and/or replacement of the following: storm drain lines, manholes, catch basins, storm water outfalls and any other related storm water structures. The contract will also include CCTV pre & post inspection of pipe networks on streets. The Contractor will install improvements on City of Greenville ROW and follow City of Greenville standard procedures provided herein. Work may involve minor improvements to storm pipe.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents