Similar Projects
Ox Trail Way Drainage Improvements
Infrastructure
Bidding
$90,000 to $140,000 est. value
Middleton, WI

Mary Lake Sediment Removal Six Mile Creek 5656 Enchanted View Lane
Infrastructure
Bidding
Waunakee, WI 53597

Culverts
Term Contract
Post-Bid
WI

Concrete Culverts
Post-Bid
WI

South Fork Pheasant Branch Creek Repairs to Channel
Results
Madison, WI 53562

Tenney Park Lagoon Biostabilization
Results
Less than $100,000 est. value
Madison, WI 53703

Erosion Control Devices
Term Contract
Post-Bid
WI

Dunning Street, Jackson Street and Lafollette Avenue Reconstruction Assessment District - 2020
Results
Less than $4,034,805 est. value
Madison, WI 53704

Village at Autumn Lake Box Culvert
Post-Bid
Madison, WI

Street End Repair-South Brearly Street
Results
Less than $38,530 est. value
Madison, WI 53703

Storm Drainage for East Campus of Central Wisconsin Center
Infrastructure
Post-Bid
Madison, WI 53704

Rockstream Drive Assesssment District - 2020
Results
Less than $2,136,420 est. value
Madison, WI 53719

Storm Drainage for West Campus of Central Wisconsin Center
Infrastructure
Post-Bid
Madison, WI 53704

Lawn Drainage Improvements
Results
$80,000 est. value
Maple Bluff, WI

2021 Street and Path Improvements
Infrastructure
Post-Bid
Fitchburg, WI

Last Updated 08/09/2021 10:39 AM
Project Title

Westview Hills Channel

Physical Address View project details and contacts
City, State (County) Madison, WI   (Dane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $125,715
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract and associated plan set describes the work necessary to improve approximately 260 LF of greenway. Including connecting the existing culverts along Prairie Hill Road to a proposed storm sewer and constructing a storm sewer system from the existing detention basin outlet to an existing catch basin along S. Pleasant View Road. Work shall include but is not limited to clearing and grubbing; brushing; grading and construction of storm sewer system; installation of riprap, erosion control and restoration

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents