Similar Projects
Emerging Environmental Requirements Acquisition (EERA)
Design
Less than $49,000,000 est. value

Environmental Remediation Services (ERS)
Term Contract
Bidding

Site Improvments: Asphalt and Concrete Work
Post-Bid
Detroit, MI

Large Site Development
Post-Bid
Detroit, MI

Rapid Response 6 Environmental Remediation Services
Results
Less than $80,000,000 est. value

Site Remediation
Results
Less than $297,978 est. value
Detroit, MI 48203

Covenant Health Center
New Construction - 24,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Detroit, MI 48228

Site Improvements: Parking and Sidewalk Areas
Post-Bid
Detroit, MI

General Contracting for Pre-Development Site Preparation
Results
Detroit, MI 48215

Quality Assurance (QA) Seeding
Post-Bid

New Construction Foundation - Excavation: 1612 Beatrice
Results
Westland, MI 48186

Residential Site Development
Post-Bid
Hamtramck, MI 48212

Former Linwood Filling Station-Site Remediation
Results
Detroit, MI 48206

Joe Louis Greenway- Site Construction 2021
Infrastructure
Post-Bid
Detroit, MI

Former Livernois Garage-Site Remediation
Results
Detroit, MI 48209

Last Updated 06/25/2021 12:06 PM
Project Title

Van Dyke Avenue Remedial Excavation

Physical Address View project details and contacts
City, State (County) Detroit, MI 48234   (Wayne County)
Category(s) Environmental, Heavy and Highway
Sub-Category(s) Site Development, Wetlands/Remediation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work will consist of mobilization, installation of temporary site security and privacy fencing; removal of asbestos containing materials and other regulated materials, demolition of building floor slab; removal of UST, excavation and disposal of non-hazardous soil, power washing and disposal of spent power washing liquids and waste, filling all floor slab cavities/holes/trenches with certified clean backfill sand, and demobilization

Details

Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Subsurface Investigation, Water Remediation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Wetlands.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents