Similar Projects
Little Scholars Academy
Renovation - 2,895 SF
Design
Huntersville, NC 28078

CMAQ Sidewalk Improvements
Post-Bid
Claremont, NC

Rockingham Community College Parking Lot Restriping and Patching
Post-Bid
Wentworth, NC 27375

Driveway Repairs for Durham County Fire Stations
Results
Durham, NC

Sunset Streetscape Improvements
Results
Blowing Rock, NC

North Main Street and Lexington Avenue Intersection and Utility Improvements
Post-Bid
High Point, NC

Haywood Streetscape
Results
Less than $4,749,345 est. value
Asheville, NC

West Water Street Parking Lot Expansion
Post-Bid
Lincolnton, NC

Wilson Street Sidewalk
Results
Wingate, NC

Parking Lot Asphalt Replacement
Post-Bid
Raleigh, NC 27607

North Academic Drive Renovation Project
Results
Less than $1,808,000 est. value
NC

Poston Park ADA Trail
Post-Bid
Lowell, NC

Little Sugar Creek Greenway and Stream Enhancement Project, I-485 to Polk Street
Results
Pineville, NC 28134

Glen Eden Tennis Access Sidewalk
Post-Bid
Raleigh, NC

Edgewood Road Parking Lot
Results
Asheville, NC 28804

Last Updated 11/27/2019 01:43 PM
Project Title

Pisgah Church Road/Lees Chapel Road and Yanceyville Street Sidewalks Part C and D

Physical Address View project details and contacts
City, State (County) Greensboro, NC   (Guilford County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract includes approximately 30,487 square yards (SY) of 4" sidewalk and 117 SY of 6" sidewalk installation. Sidewalks will be installed along the following streets: 1. Lees Chapel Road a. on both sides from Church Street to Yanceyville Street, b. on the South side from Yanceyville Street to Brightwood School Road, and c. on the North side where no sidewalks exists from Yanceyville Street to Presnell Way. 2. Pisgah Church Road on both sides where no sidewalks exists a. from Lawndale Drive to Battleground Avenue, b. from Willoughby Drive to Lawndale Drive, and c. from Church Street to Willoughby Drive. 3. Yanceyville Street on both sides where no sidewalk exists a. between Water Street and Cone Boulevard, b. between Bessemer Avenue and Water Street, and c. between Cone Boulevard and Lees Chapel Road.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents