Similar Projects
Statewide Pavement Maintenance 2021-2022
Term Contract
Bidding
Less than $5,000 est. value

Statewide Pavement Maintenance 2021-2022
Term Contract
Bidding
Less than $5,000 est. value

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Seal Coat
Bidding
Fennimore, WI

2021 Town Road Improvement
Post-Bid
WI 53923

STH 11 - Mineral Point, County Shop Road - Minvera Street, STH 11 - Mineral Point, County Shop Road - Minvera Street
Results
Mineral Point, WI 53565

2021 Town Road Improvement Discretionary - Keough Springs Road
Bidding
Linden, WI 53553

Gravel, Single Chip Seal Coating and Crack Filling
Post-Bid
Bloomington, WI

Avoca - Richland Center, Wisconsin River Bridge to CTH RC
Results
Avoca, Richland Center, WI 53506

Seal Coat
Post-Bid
Glen Haven, WI

CTH T - CTH T, Mill Creek Bridge, B-25-0186
Results
WI

2021 Road Work
Post-Bid
Bagley, WI

Last Updated 04/19/2021 11:39 AM
Project Title

Avoca - Richland Center, STH 133 - West County Line; Muscoda - Lone Rock, STH 80 - STH 130

Physical Address View project details and contacts
City, State (County) Avoca, Lone Rock, Muscoda, Richland Center, WI (Grant, Iowa, Richland Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation Common, 65 CY; Base Aggregate Dense, 7,924 Ton; Marking Epoxy, 189,583 LF; Construction Staking, 64,252 LF; Construction Staking, 24 Each; Construction Staking, 2 LS; Concrete Curb and Gutter, 52 LF; Concrete Sidewalk, 1,379 SF; Beam Guard, 176 LF; Beam Guard Energy Absorbing Terminals, 5 Each; Asphaltic Surface, 1,844 Ton; HMA Pavement, 19,500 Ton; Removing Asphaltic Surface Milling, 185,650 SY; Tack Coat, 13,350 Gals.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents