Similar Projects
Northern Region - Two Phase Design-Build and Construction IDIQ MATOC in Support of DHA
New Construction
Design
$500,000 to $5,000,000 est. value
Watertown, CT

Boiler Replacement, West Thompson Lake
Renovation
Design
$25,000 to $100,000 est. value
Thompson, CT

RFQ- Service/Maintenance for the Building Security System
Term Contract
Bidding
Hartford, CT 06103

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Building 38 Structural Repairs to Carpentry Shop
Renovation
Results
$250,000 to $500,000 est. value
Groton, CT 06340

Building 802 Latrine Renovations
Renovation
Results
$960,400 CJ est. value
East Lyme, CT 06357

Replacement of Doors at USCG Sector Long Island Sound, New Haven, Ct.
Renovation
Design
$70,000 CJ est. value
East Haven, CT 06512

EHRM Infrastructure Upgrades, Newington Campus
Renovation
Post-Bid
$20,000,000 CJ est. value
Newington, CT 06111

Enfield Armory Kitchen and Latrine Renovation Enfield Armory
Renovation
Results
$1,891,400 CJ est. value
Enfield, CT 06082

Upgrade OR Utilities Construction at VA West Haven, CT
Renovation
Design
$50,000,000 CJ est. value
West Haven, CT 06516

Major Repairs Quarters 5, U.S. Coast Guard Academy
Build-out, Renovation
Post-Bid
$3,000,000 CJ est. value
New London, CT 06320

Janitorial Services
Term Contract
Design
Stamford, CT 06901

USCG Academy Repair HVAC System ay Yeaton Hall
Build-out, Renovation
Post-Bid
$3,000,000 CJ est. value
New London, CT 06320

Construct New Inpatient Pharmacy West Haven
New Construction, Infrastructure
Post-Bid
$20,000,000 CJ est. value
West Haven, CT 06516

Last Updated 01/08/2024 11:22 AM
Project Title

Refinish Drill Shed Hartford Armory

Physical Address View project details and contacts
City, State (County) Hartford, CT 06106   (Hartford County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,281,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Bidding Limited To: Contractors Prequalified by DAS for General Building Construction (Group C) Prevailing wages are required on this project, in accordance with the schedule provided in Section 00 73 44 Prevailing Wage Rates, pursuant to Connecticut General Statutes (C.G.S.) Section 31-53 (a) through (h), as amended. Each contractor who is awarded a contract on or after October 1, 2002 shall be subject to provisions of C.G.S. 31-55a concerning annual adjustments to prevailing wages. Wage Rates will be posted each July 1st on the Department of Labor portal. Such prevailing wage adjustment shall not be considered a matter for any contract amendment. Contract Time Allowed: Calendar Days: 270 Liquidated Damages: $ 839.00 Per Calendar Day Beyond Substantial Completion. $ 839.00 Per Calendar Day Beyond 90 days After Substantial Completion. Set-Aside Requirements: SBE Subcontractors &/or Suppliers: 25%; MBE Subcontractors &/or Suppliers: 6.25% 1.This project includes repair work and the refinishing of miscellaneous surfaces on the interior of an existing Building - approximately 50,000 gross square feet. 2.The work is contained within a single area/space of the Building - the main assemble area. The scope of work includes, but may not be limited to; the repair and refinishing of the wood floor, the painting of the walls, new stripping for various sport events, new sound system with video scoreboards and added acoustical treatments. 2. The building is existing. The work is contained within a single area/space of the Building - the main assemble area. The scope of work includes, but may not be limited to; the repair and refinishing of the wood floor, new stripping for various sport events, new sound system, added acoustical wall treatments, optional acoustical ceiling treatments and optional video scoreboards. 3. This Project Exceeds the Threshold limits as defined by the Connecticut General Statutes. 4. This project is an Agency Administered project as defined by CG Statutes. 5. The Agency will remove any and all loose materials on the floor and walls prior to the start of the Construction. 6. The Drill Shed may be partially occupied during the Construction Phase of the Work. Events will be coordinated in advance with the General Contractor. Protection of completed work may be required. This will be discussed and addressed during regular weekly meetings as the need arises. 7. Vector Files will be provided for the National Guard Logo and the Minuteman to the General Contractor that is awarded the project. 8. The existing Concrete Floor Areas are NOT included in the Contract Work. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Work covered by these contract documents includes but is not limited to the following: 1. The replacement and/or repairing of portions of the existing Wood Athletic Flooring; 2. The refinishing of the existing Wood Athletic Flooring; 3. New Court Stripping for Basketball Courts, Volleyball Courts and a Running Track; 4. The installation of National Guard Floor Logo and Minuteman; 5. Wall Surface Protection Systems (Acoustical Panels); 6. Ceiling Surface Protection Systems (Acoustical Panels - Optional Bid Items #1 and #2); 7. New Sound Equipment; 8. Electrical Wiring for Video Boards; 9. New Video Display Boards (Optional Bid Items #3, #4 and #5)

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents