Similar Projects
Ground Storage Tank and Elevated Storage Tank Recoating at Water Plant Number 1
Infrastructure
Bidding
TX

Elevated Storage Tank Recoating
Infrastructure
Bidding
$467,000 est. value
Spring, TX 77379

Construction of Water Plant No. 2 - Ground Storage Tank No. 2 Replacement
Post-Bid
$1,344,000 est. value
Houston, TX 77084

Preventive Maintenance, Repair and Tank Cleaning of Asphalt Storage Tanks
Term Contract
Post-Bid

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Water Tank Replacement Project - Hillridge Water Plant
Results
Less than $160,000 est. value
La Porte, TX 77571

Rehabilitation of Uvalde GST and HPT, Street and Finan's EST, GST 1 and 2
Infrastructure
Bidding
TX

J035--RFI-Sources Sought Thermal Energy Storage Tank Repair
Post-Bid
Houston, TX 77030

World-Wide Water Storage Tank Remediation
Term Contract
Results

Ground Storage Tank Replacement
Post-Bid
TX

Construction of Water Plant No. 1 - Ground Storage Tank & Surface Water Metering Station Additions
Results
Less than $2,036,063 est. value
TX

Construction of Water Plant No. 4
Infrastructure
Post-Bid
$4,500,000 est. value
Houston, TX 77017

Water Plant No. 1 Ground Storage Tank Additions
Results
$800,000 est. value
Houston, TX 77070

Water Plant Expansion
Infrastructure
Post-Bid
Katy, TX 77450

Elevated Tank Rehabilitation
Results
Less than $450,000 est. value
Channelview, TX 77530

Last Updated 11/09/2021 08:20 AM
Project Title

HPW - Rehabilitation of Water Storage Tanks - Package 12

Physical Address View project details and contacts
City, State (County) Houston, TX 77099   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,446,700
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work of the Contract is for the Rehabilitation of three (3) ground storage tanks, one (1) elevated storage tank; demolition of one (1) galvanized bolted steel ground storage tank and construction of one (1) galvanized bolted steel ground storage tank at four (4) pumping stations. Provide materials, labor, equipment and superintendence in accordance with the technical specifications, project drawings and contract documents.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents