Similar Projects
Rest Areas and Welcome Centers Across the State
Term Contract
Post-Bid

Asphalt Midway Early Childhood Center Parking Lot
Post-Bid
Holt, MI

2018 Parking Lot Rehabilitation
Results
Mason, MI

Dr Eva Evans Welcome Center Parking Lot Repairs
Results
Lansing, MI

2019 Veteran`s Memorial Park Parking Lot Rehabilitation
Post-Bid
Less than $166,500 est. value
Stockbridge, MI 49285

Okemos Road Boardwalk 2019
Results
Less than $1,100,000 est. value
Okemos, MI

Parking Lot 62W-IM West Reconstruction
Post-Bid
East Lansing, MI

Concrete Sidewalks Replacement
Results
Mason, MI

Parking Lot 54 Resurfacing And Improvements
Post-Bid
East Lansing, MI

Concrete Repair Contract 2019
Results
Okemos, MI 48864

Administration Parking Lot Improvements
Post-Bid
Lansing, MI

2019 Sidewalk Improvements
Results
Less than $196,040 est. value
Holt, MI

Wainwright Parking Lot
Post-Bid
Lansing, MI

2019 Parking Lot Rehabilitation - Administration Parking Lot
Results
Mason, MI

CDBG Albert Avenue Sidewalk Improvements Phase II
Post-Bid
East Lansing, MI

Last Updated 04/02/2019 10:25 AM
Project Title

Mason Sidewalk and Concrete Improvements: Summerwood Subdivision; Mason Downtown Business District; and Laylin Park

Physical Address View project details and contacts
City, State (County) Mason, MI   (Ingham County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $221,695
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description This project consists of substantial sidewalk and concrete improvements in several areas, including: Summerwood Subdivision; Downtown Mason Business District; and Laylin Park on East Maple Street, all within the City of Mason City Limits. Construction shall include: removal and replacement of 4" concrete sidewalk totaling approximately 2,500 sq. ft.; removal and replacement of 6" concrete ADA ramps totaling approximately 3,600 sq. ft.; remove and salvage existing Downtown brick pavers totaling approximately 1,350 sq. yds.; installation of 6" concrete sidewalk totaling approximately 12,000 sq. ft.; installation of truncated dome ramp panels, (2' x 2.5' "Tuftile cast iron) totaling approximately 110 each; removal and replacement of concrete curb and gutter totaling approximately 1,100 L. ft.; bituminous hand patching at new curb replacement totaling approximately 60 tons; installation of 4" concrete pads totaling approximately 450 sq. ft.; signing and traffic control for both vehicles and pedestrians, complete restoration and cleanup and other miscellaneous work items normally included with the described work items.
Details
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents