Similar Projects
Last Updated | 08/17/2022 10:35 AM |
Project Title | Priority II Sewer Mainline and Lateral Replacement |
Physical Address | View project details and contacts |
City, State (County) | Riverside, CA 92522 (Riverside County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,654,350 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of August 17th, 2022, the Edgemont Community Service District’s Priority II Sewer Mainline and Lateral Replacement project will not be awarded nor will the project be re-bid at this time. Prospective bidders are hereby notified that the Edgemont Community Services District, California (District) will receive sealed bid proposals for the Edgemont Community Services District Priority II Sewer Mainline and Lateral Replacement. The projects consist of approximately 200-feet of 6-inch diameter PVC or VCP sewerline; 1,220-feet of CIPP of existing 6-inch or 8-inch diameter sewerline; manholes; and laterals and cleanouts in Gina Avenue, Dracaea Avenue, Brill Road, Nolze Place, Sherman Avenue, Grant Street, Farragut Avenue, Phyllis Avenue, Ella Avenue, Bertie Avenue and Elsworth Street, including all sewer bypassing, trenching and backfilling, traffic control, surface restoration, sidewalk curb & gutter, paving and street restoration. The successful Contractor shall furnish all labor, material, transportation, tools, supplies, plant, equipment, and appurtenances, unless specifically excepted, for the satisfactory completion of the entire contract work, in accordance with the Specifications and Drawings. Questions from prospective bidders affecting interpretation or corrections related to the Plans and Specifications received after 5:00 p.m. on Monday, July 18, 2022 will not be answered. The Engineer's Estimated Construction Cost is $2,090,000. All work under this contract shall be completed and operational within two hundred fifty (250) calendar days from the date District gives written "Notice of Award" to the Contractor. Each proposal must be accompanied by: (a) cash; (b) a certified or cashier's check made payable to the "Edgemont Community Services District"; (c) equivalent cash or securities pursuant to Section 995.710 of the Code of Civil Procedure, or (d) a bid bond payable to "Edgemont Community Services District" executed by the bidder as principal and surety as obligor in an amount equal to ten percent (10%) of the maximum amount of the bid. Personal sureties and unregistered surety companies are unacceptable. The surety insurer shall be a California admitted surety insurer, as defined in Code of Civil Procedure Section 995.120. The cash, check, equivalent cash or securities, or bid bond shall be given as a guarantee that the bidder, if an award is made to the bidder in accordance with the terms of said bidder's proposal, shall provide the payment and performance bonds and insurance certificates and endorsements as required herein within ten (10) calendar days after notification of the award of the Contract to the bidder. Failure to provide the required documents may result in forfeiture of the bidder's bid deposit or bond to the District and the District may award the Contract to the next lowest responsive, responsible bidder, or may call for new bids; the bidder shall also: a. Execute a contract in the District's standard form together with the Labor Code certification thereon. Said contract shall incorporate by reference the Notice Inviting Bids; the Proposal; Bidder's Plan for Construction; Bidder's Statement of Experience, Financial Condition and References; Bidding Sheet; General Conditions; Special Requirements; Basic Specifications; Technical Specifications; and Drawings; b. Furnish a performance bond as required thereby with a corporate surety or sureties satisfactory to the District, or equivalent cash or securities for the faithful performance of the said contract. Personal sureties and unregistered surety companies are unacceptable. The surety insurer shall be a California admitted surety insurer, as defined in Code of Civil Procedure Section 995.120. Said performance bond shall be for an amount of not less than one hundred percent (100%) of the total bid price; c. Furnish also a labor and materials payment bond with a corporate surety or sureties satisfactory to the District. Personal sureties and unregistered surety companies are unacceptable. The surety insurer shall be a California admitted surety insurer, as defined in Code of Civil Procedure Section 995.120. Said bond shall be for an amount of not less than one hundred percent (100%) of the total bid price; d. Furnish certificates of insurance and endorsements, evidencing that all insurance coverage required by the Contract has been secured. All contract construction shall be by an organization which has had successful experience in the construction of facilities of the TYPE & SIZE SPECIFIED, OR COMPARABLE. Each bidder shall be a licensed contractor pursuant to the Business and Professions Code and shall be licensed in the following appropriate classification(s) of contractor's license(s), for the work bid upon, and must maintain the license(s) throughout the duration of the Contract: Class "A" (General Contractor) or "C-34" (Pipeline) License. If the bidder is a specialty contractor, the bidder is alerted to the requirements of Business and Professions Code Section 7059. The District requires the Contractor to selfperform fifty-five percent (55%) of the work bid upon. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to perform the work available to interested parties upon request, and shall post copies at the Contractor's principal place of business and at the job site. The successful bidder and all subcontractor(s) under him, shall comply with all applicable Labor Code provisions, which include, but are not limited to the payment of not less than the required prevailing rates to all workers employed by them in the execution of the Contract, the employment of apprentices, the hours of labor and the debarment of contractors and subcontractors. Contractor shall defend, indemnify and hold the District, its elected officials, officers, employees and agents free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure to comply with the prevailing wage laws. The Contractor shall forfeit, as a penalty to the District, $200.00 for each calendar day or portion thereof for each workman paid less than the said stipulated prevailing rates for any work done under the contract by him or by any subcontractor under him in violation of the California Labor Code. The Bidder shall examine carefully the site of the proposed contract work. The submission of a bid proposal shall be conclusive evidence that the Bidder has investigated the project site and is satisfied as to the conditions to be encountered. There will be no specific site tour by the District for the project. Please contact the project engineer Sinnaro Yos of Albert A. Webb Associates at 951-830-2943 or submit an email to sinnaro.yos@webbassociates.com for questions pertaining to the project. |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |