Reported | 04/15/2022 12:00 AM |
Project Title | 2022 Street Improvement Phase 1 |
Physical Address | View project details and contacts |
City, State (County) | Lake Geneva, WI (Walworth County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected May 2022 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work for which bids are asked includes the following: The 2022 Street Improvements - Phase 1 project includes work for pavement replacement, replacement of poor road base where needed, spot replacement of curb & gutter, and sidewalk repair and replacement including curb ramps,. Campbell Street, Skylane Drive, Henry Drive, Warren Street, and Spring Street are all planned for full depth mill and replacement of the existing asphalt surface, spot replacement of curb & gutter, sidewalk repairs including removal and replacement, and replacement of existing curb ramps that do not meet current standards. Two alleyways, located between West Street & East Street and Water Street & Do-dge Street, are planned to have the existing asphalt surface pulverized, regraded, and repaved Select concrete drive entrances on Broad Street will be replaced along with new concrete sidewalk ramps at the intersection of West Main Street & West Street. Structure casting and gate valve box adjustments and replacements will be done as needed within project limits. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |