Similar Projects
Blower Building 090 Blower - 23R04 - North Shore Water Reclamation District
Alteration
Conception
$1,409,400 est. value
Gurnee, IL

Blower Building 090 Blower - 23R04 - North Shore Water Reclamation District
Alteration
Conception
$1,409,400 est. value
Gurnee, IL

Raw Influent Valve, Actuator, and Flowmeter At the Clavey Road Water Reclamation Facility
Infrastructure
Bidding
$550,000 est. value
Highland Park, IL

W3 Water Line Between Primary Tanks and Aeration Tanks
Infrastructure
Bidding
$430,000 est. value
Gurnee, IL

Vernon Hills West Pump Station Force Main Analysis for Lake County
Post-Bid
Waukegan, IL

2021 Sanitary Transmission Sewer Lining Program
Post-Bid
Lake Zurich, IL

Gurnee Industrial Interceptor Sewer Inspection
Results
Gurnee, IL

Hawthorn Hills Square Watermain Replacement
Results
IL

UV System Upgrade - Construction - 23R23 - North Shore Water Reclamation District
Alteration
Conception
$3,147,200 est. value
Gurnee, IL

2022 Sanitary Sewer Cleaning and Lining Project
Infrastructure
Bidding
$987,000 est. value
Fox Lake, IL

Wickham Court Watermain Extension
Post-Bid
Green Oaks, IL 60048

Emergency Water Mains Repairs
Results
Grayslake, IL

PS1 24" Forcemain - Construction - 22A01 - North Shore Water Reclamation District
Infrastructure
Conception
Less than $5,368,000 est. value
Gurnee, IL

Environmental Education Building Construction - Bid Package 14 - Waste Water System
Infrastructure
Bidding
$2,750,000 est. value
Deerfield, IL 60015

2021 Sanitary Sewer Spot Repair
Post-Bid
Libertyville, IL

Last Updated 07/15/2022 08:19 AM
Project Title

2022 Water Main and Sanitary Sewer Improvements Juniper Street Project

Physical Address View project details and contacts
City, State (County) Gurnee, IL 60031   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of installing approximately 1700 LF - 8" PVC C900 WM, 450 LF - 6" PVC, 5 EACH - Fire Hydrants, 5 Each - 8" Valve in Vaults, 1 EACH - 6" Valve in Vaults, 17-1.5" water service connection, 8" San Sewer - 800 FT, 5 EACH - San. Manholes, 350 FEET - 6" PVC Sanitary Sewer Service, 101 FT - 12" Ductile Iron Culvert, 45 FT - 18" Ductile Iron Culvert, 160 FT - 12" PVC SDR-18 Storm Sewer, 175 FT - 18" PVC SDR-18 Storm sewer, 120 FT - 24" PVC SDR-18 Storm Sewer, 2 EACH - Storm Manholes with Grate, 700 CY - Trench Backfill, 100 SF - PCC Sidewalk, 2,000 SY - Topsoil Furnish and Place, and all other work necessary to complete the improvements.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents