Similar Projects
Last Updated | 03/25/2019 01:19 PM |
Project Title | Langford Drive Full Depth Reclamation |
Physical Address | View project details and contacts |
City, State (County) | Norcross, GA (Gwinnett County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Qualified contractors for Full Depth Reclamation and minor widening of Langford Drive from Hunter Street to West Peachree Street in Norcross, GA. All valves and manhole covers shall be adjusted to be flush with final grade. FDR shall be a minimum 6% cement ration to the dry soil weight. Assume that the dry soil wieght is 125 pcf (+/- 5%). | ||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |