Similar Projects
Germantown/Eastbank Pedestrian Bridge - 19DS0129 - Metropolitan Government of Nashville & Davidson County
Infrastructure
Conception
$22,139,044 CJ est. value
Nashville, TN 37219

Global Mall at the Crossings Redevelopment
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Cane Ridge, TN 37013

North Edgehill Commons
New Construction, Infrastructure - 160,000 SF
Design
$361,000,000 CJ est. value
Nashville, TN 37203

MTRO Essential Maintenance
Renovation, Infrastructure
Design
$3,400,000 CJ est. value
Nashville, TN 37214

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Tennessee State University - Hoop Houses
Demolition, New Construction, Renovation, Infrastructure - 10,000 SF
Bidding
$4,000,000 CJ est. value
Nashville, TN 37209

Annual Rehabilitation FY2017 Dry Creek
Infrastructure
Post-Bid
$5,500,000 est. value
Nashville, TN

Herman Street Mixed-Use
New Construction, Infrastructure - 2,000 SF
Post-Bid
$100,000,000 CJ est. value
Nashville, TN 37208

8th Avenue South and Moss Rose Drive Water Main
Infrastructure
Results
Nashville, TN 37216

24" Brick Church Water Main Replacement
Alteration
Results
Nashville, TN

Hayes Street Mixed-Use
New Construction, Infrastructure - 10,000 SF
Construction
$20,000,000 CJ est. value
Nashville, TN 37203

SkyHarbour Jet Hangars - Nashville International Airport
New Construction, Infrastructure
Construction
$11,368,179 CJ est. value
Nashville, TN 37217

Monroe Street Mixed-Use
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Nashville, TN 37208

Main Street Mixed-Use
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Nashville, TN 37206

Old Hickory Boulevard Warehouses
New Construction, Infrastructure - 181,200 SF
Conception
$19,500,000 CJ est. value
Nashville, TN 37013

Last Updated 12/07/2022 06:33 PM
Project Title

RFQ Construction Manager at Risk - The Schrader, Benedict andCrutcher, and Boscobel Sewer Separation Project

Physical Address View project details and contacts
City, State (County) Nashville, TN 37208   (Davidson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $140,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Payment Terms N30 Minority Business Enterprise (MBE) Percentage Goal: 3% Woman Business Enterprise (WBE) Percentage Goal: 3% Bonds A Payment and Performance Bond is required for a contract award exceeding $100,000. The awarded firm shall submit a Payment Bond and a Performance Bond as a condition precedent to a Contract or purchase order. Documentation of bonds shall be in a format acceptable to Metro. Timeframe (60 minutes max) - MWS to ask questions in rotation. All Proposer's will be asked the same questions. Failure to respond to a question will result in point deductions, therefore, Proposers are encouraged to be mindful of the time during the Question/Answer portion of the interview. Round 3 Offerors evaluated as qualified from Round 2 will be invited to the next round(s) wherein Offerors will submit Cost for a total of 100 Points Round 3 - Cost Evaluation Criteria (100 Points Maximum) For the purposes of evaluation, the project shall be assumed to have a conservative projected estimate for the construction of $140,000,000. The budgetary cost will be updated as the project progresses in design and engineering. The lowest evaluated cost will be awarded the maximum points, and other Proposers will receive points based on their cost in proportion to the lowest cost. If in the view of Metro, the information submitted is not reasonable, this may result in the rejection the proposal as non responsive or in a reduction of score, if, in the sole evaluation by Metro, the proposed hours or rates would not result in the best interests of Metro and the success of this project. If determined to be fair and reasonable by Metro, contractor-quoted fees and billing rates will be used as the basis for the contract and payment to the contractor. Proposers shall not submit unrealistically low values in order to obtain a more favorable rating from the Evaluation Panel. It is anticipated that the quoted fees and billing rates will be used as a basis for developing the Guaranteed Maximum Price (GMP) proposals by the CMAR. Points from Round 1, 2, and 3 be added together to determine who receives the max points.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents