Similar Projects
Corrugated Steel Pipe and Bands
Bidding
Hamburg, AR

Streambank Stabilization - Woods - Arkansas River
Infrastructure
Bidding
Little Rock, AR 72223

Upper Riverside Interceptor Assessment, Phase II
Post-Bid
$40,017 est. value
North Little Rock, AR 72117

Sewer Collection Rehabilitation
Post-Bid
Fairfield Bay, AR

Rose City and Military Drive Basins CIPP 2021 Rehabilitation Project
Results
$1,637,100 est. value
North Little Rock, AR 72117

HSWS Outfall Improvements
Results
$4,000,000 est. value
Heber Springs, AR

Rose Creek, Rebsamen, Grassy Flats, and Rock Creek I and I Reduction Project / Contract 1 Pipeburst / Relay In Place Sewerline Rehabilitation
Infrastructure
Bidding
Little Rock, AR

Little Osage Creek Gravity Sewer Improvements Project
Infrastructure
Post-Bid
Bentonville, AR

Sewer Line Project Rehabilitation
Results
England, AR

Pace Lane Improvements
Infrastructure
Bidding
Cave Springs, AR 72718

Drainage Improvements
Infrastructure
Post-Bid
Ward, AR

Hwy. 154 Slide Repair (Conway CO)
Results
AR

2022 Concrete Culverts
Term Contract, Infrastructure
Bidding
Bentonville, AR

Reclamation of Brotherton Highwall
Infrastructure
Post-Bid
Branch, AR

PLWC Basins 1-3-4 Manhole Rehabilitation
Results
Less than $603,200 est. value
Paragould, AR

Last Updated 02/08/2022 09:00 AM
Project Title

Deans Trail Phase 2

Physical Address View project details and contacts
City, State (County) Springdale, AR   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,300,000 to $2,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes, but not limited to, the construction of Dean’s Trail from Oriole Street west to Thrush Street, under Highway 412 in a proposed precast concrete box culvert tunnel, then east to Sara Ford Avenue. The Contract consists of 1,738-ft of 12’ wide concrete trail, precast concrete box culvert 12-ft x 10-ft tunnel, drainage improvements, and water and sanitary sewer relocations.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents