Similar Projects
Last Updated | 03/04/2022 10:22 AM |
Project Title | CM/GC for Cold Springs Transmission Pipeline Rehabilitation 2021 |
Physical Address | View project details and contacts |
City, State (County) | Spanish Fork, UT (Utah County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Rehabilitate the existing 30-inch Cold Springs water line. The CM/GC on this project will be involved during the preconstruction and construction stages of the rehabilitation project. The project will include the rehabilitation of the existing 30-inch cement mortar lined and coated steel pipeline. It is anticipated that the preferred methods for pipeline rehabilitation will be slip lining with HDPE or CIPP lining. A section of the pipeline is in the existing UPRR right-of-way which will require permitting for the rehabilitation and possibly relocating a section of pipeline. The project construction will also include the following. 1. Constructing a new connection vault at the tank site. 2. Connecting to both ends of a section of existing 30-inch HDPE pipe. 3. Constructing a new drain on the 30-inch pipeline. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |