Similar Projects
Payson City 100 South Pressurized Irrigation Waterline Project
Infrastructure
Bidding
Payson, UT 84651

North Industrial Water and PI Improvements
Infrastructure
Bidding
$1,800,000 to $2,200,000 est. value
Spanish Fork, UT

River Bottom Improvement Project Prequalification
Post-Bid

Pressurized Irrigation Extension Project 2021
Post-Bid
Mapleton, UT

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

200 South Water Main Improvements
Results
$3,000,000 to $3,400,000 est. value
American Fork, UT 84003

Cedar Hills Ultrasonic Solid State Water Meter and Related Installation
Infrastructure
Bidding
Cedar Hills, UT

Woodland Hills Waterline Replacement - Phase 2A
Infrastructure
Post-Bid
Woodland Hills, UT

36" Culinary Water Line Replacement Project Segment 2
Results
Less than $10,051,493 est. value
American Fork, UT 84003

2021 CDBYI Project (Community Development Building Yard Improvements)
Infrastructure
Post-Bid
Eagle Mountain, UT 84005

Mill Ditch Project
Results
Less than $1,665,895 est. value
Pleasant Grove, UT 84062

Heritage Park Utility Pipelines
Infrastructure
Post-Bid

2020 Waterline
Results
$1,700,000 to $1,900,000 est. value
Orem, UT

1100 North Street and Waterline Project
Infrastructure
Post-Bid
Pleasant Grove, UT 84062

2020 2000 South PRV Project
Results
Orem, UT 84058

Last Updated 03/04/2022 10:22 AM
Project Title

CM/GC for Cold Springs Transmission Pipeline Rehabilitation 2021

Physical Address View project details and contacts
City, State (County) Spanish Fork, UT   (Utah County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitate the existing 30-inch Cold Springs water line. The CM/GC on this project will be involved during the preconstruction and construction stages of the rehabilitation project. The project will include the rehabilitation of the existing 30-inch cement mortar lined and coated steel pipeline. It is anticipated that the preferred methods for pipeline rehabilitation will be slip lining with HDPE or CIPP lining. A section of the pipeline is in the existing UPRR right-of-way which will require permitting for the rehabilitation and possibly relocating a section of pipeline. The project construction will also include the following. 1. Constructing a new connection vault at the tank site. 2. Connecting to both ends of a section of existing 30-inch HDPE pipe. 3. Constructing a new drain on the 30-inch pipeline.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents