Similar Projects
Sky View High School Pool AHU and Mountain Crest High School Boiler Replacement Project
Bidding
Hyrum, Smithfield, UT 84335

Boiler
Bidding
Cedar City, UT

Hydraulic Pumps, Cylinders, Motors and Related Services
Term Contract
Post-Bid
Salt Lake City, UT

Millville Elementary School Chiller Project
Post-Bid
Millville, UT 84326

J--NIIP B2.9L Unit 4 Motor Rewind and Reconconditioni
Results
Salt Lake City, UT 84044

Salt Lake City (SLC) Cooling Tower Mechanical Separator
Results
$25,000 to $50,000 est. value
Salt Lake City, UT

DFCM Construction - Pre Qualified Mechanical - DOH USL MOD 1 Autoclave Replacement
Bidding
$125,000 est. value
Taylorsville, UT 84129

Design-Build Mechanical Upgrade at DISA
Post-Bid
$10,000,000 to $25,000,000 est. value
UT

University of Utah High Temperature Water Converter Building 25
Term Contract
Results
$20,000 to $25,000 est. value
Salt Lake City, UT 84112

Aquatic Center Boiler Replacement Project
Post-Bid
Roy, UT 84067

Annual Contract for Boiler Repairs
Term Contract
Results
Salt Lake City, UT 84115

Annual Contract for Plumbing/Mechanical Work
Term Contract
Post-Bid
Salt Lake City, UT 84115

Construction: Westbrook Elementary, Boiler Replacement
Results
Taylorsville, UT 84129

Mckinley Elementary School Boiler Replacement Project
Post-Bid
Tremonton, UT 84337

East Layton Elementary Boiler and Chiller Replacement
Results
$125,000 to $250,000 est. value
Layton, UT 84040

Last Updated 11/20/2019 02:52 PM
Project Title

Pleasant Grove High School Boiler Replacement

Physical Address View project details and contacts
City, State (County) Pleasant Grove, UT 84062   (Utah County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of: 1. Demolition of the existing boiler and piping indicated on drawings. 2. Provision and installation of the new boilers, piping, and accessories as indicated on drawings and within the specifications. 3. Re-balancing of flow through new boilers. 4. The project shall be completed as soon as possible, but no later than January 31, 2020. 5. The Work will be constructed under a single prime contract.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents