Similar Projects
Gaineswood Waterline Project
Post-Bid
Tuscaloosa, AL

FY 2019 City Wide Streets Resurfacing Project
Post-Bid
Tuscaloosa, AL 35403

Southern Region Disaster Recovery Support BPA
Results

Ferguson Center South Porch Paver Replacement
Results
Less than $150,000 est. value
Tuscaloosa, AL 35487

Martin Luther King Jr Boulevard / Jack Warner Parkway Improvements - Phase I
Post-Bid
Tuscaloosa, AL 35403

South - Regional Construction MATOC
Results
$500,000 to $1,000,000 est. value

Bryce Campus Utilities and Infrastructure
Post-Bid
$1,200,000 to $1,400,000 est. value
Tuscaloosa, AL

Constructing the Turn Lanes (Grading, Drainage, and Pavement), Planing, Resurfacing, Traffic Signs, and Traffic Stripe
Results
$1,215,586 to $1,485,716 est. value
AL

Owners Agent for Design-Build Projects
Post-Bid
Camden, Fayette, Thomasville, AL

Constructing the Safety Improvements (Curve Warning Sign Installation) on Various Routes in the West Central Region (Tuscaloosa Area)
Results
$305,307 to $373,153 est. value

Hay Court, Crescent East and Branscomb 2020 Development Improvements Project
Post-Bid
Tuscaloosa, AL 35401

Constructing the Safety Widening, Planing, Resurfacing, Guardrail Installation, and Traffic Stripe
Results
$5,816,001 to $7,108,446 est. value
AL

FY 2021 Annual Road Repairs and Renewal
Term Contract
Post-Bid
$650,000 est. value
Tuscaloosa, AL 35406

Constructing the Safety Widening, Planing, Resurfacing, Guardrail Installation, and Traffic Stripe
Results
$4,301,925 to $5,257,909 est. value
AL

Resurfacing of Local Streets 2020 Project
Results
Less than $3,486,717 est. value
Tuscaloosa, AL 35403

Reported 06/04/2021 12:00 AM
Project Title

Project to Widen the Existing Access Road

Physical Address View project details and contacts
City, State (County) Tuscaloosa, AL   (Tuscaloosa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect/Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project to widen the existing access road, Frankie Thomas Trace, providing increased capacity for Northport Elementary and the new Northport Intermediate School. Earthwork, 12,000 s.y. Crushed Stone Base, 24,000 s.y. Asphalt Final Wearing Surface, 17,000 s.y. Asphalt Binder, 7,000 l.f. Curb/Curb and Gutter/Valley Gutter, 430 l.f. Storm Drain (15"- 30"), 17 Storm Drainage Structures (S-inlet, Junction Box), 7 Headwalls (15" - 24"), 21 Remove/Replace Inlet Tops (S-inlet, Junction Box, Yard Inlet), 440 l.f. Water Main (8" - 12"), 10 Gate Valves (8" - 12"), Erosion Control, 25,000 l.f. Striping, Markings, Permanent Signage, 1,250 l.f. Fencing.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving Surface Treatment, Asphalt Surface Treatment, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Aggregate Surfacing, Crushed Stone Surfacing, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Paving Specialties, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents