Reported 10/17/2020 12:00 AM
Project Title

Sanitary Sewer Flow Monitoring

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27601   (Wake County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Manage the utilities wastewater flow monitoring network, which includes 38 permanent flow monitors, 5 level only monitors, 1 rain gauge, and a web-based monitoring application. The City currently receives data from a permanent ADS flow, level and rainfall network. The data is accessible through wireless communication and includes alarming, reporting and data sharing through ADS FlowView/PRISM cloud-based data platform web-based software suite. The installed network consists of the following: • 38 Triton+ Intrinsically Safe (IS) area velocity flow monitors with CS4 sensors (ultrasonic depth, redundant pressure depth and Doppler velocity sensors) • 5 ECHO level monitors • 1 RainAlert III rain gauge • ADS web-based FlowView/ADS Prism software The 38 Triton+ area velocity flow monitors and 1 RainAlert III rain gauge are owned and maintained by the current Contractor, ADS. The 5 ECHO level monitors are owned and maintained by the City. The City is requesting proposals to replace its current network and the service contract will include: • Provision and installation of new flow monitors and rain gauges of equal or superior technology specification of the currently installed equipment. • The Contractor will be required to assure the system has current modem communications with wireless carriers for the duration of the project. • All maintenance and equipment necessary to maintain the network and guarantee a 95% uptime of reliable data. • Web-based data management system for alarming and web hosting of near real time and historic data. • Review of flow monitoring data for quality assurance. • Monitors will push data to Web-based data management system hourly so the City can utilize API to pull data in order to integrate this data with other City software.

Details

Division 25 - Integrated Automation, Integrated Automation Control and Monitoring Network.
Division 27 - Communications, Distributed Communications and Monitoring Systems.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents