Similar Projects
Palm Coast Library Driveway and Parking - Flagler County
Infrastructure
Conception
$435,000 CJ est. value
Palm Coast, FL 32137

Palm Coast Library Driveway and Parking - Flagler County
Infrastructure
Conception
$435,000 CJ est. value
Palm Coast, FL 32137

Secure Space Self Storage
New Construction, Infrastructure - 31,500 SF
Design
$3,400,000 CJ est. value
Palm Coast, FL 32137

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Hargrove Grade Road Reconstruction - Flagler County
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Bunnell, FL 32110

Hargrove Grade Road Reconstruction - Flagler County
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Bunnell, FL 32110

Central Florida Rail Corridor (CFRC) Lake Monroe Drawbridge Painting
Infrastructure
Results

Silicone Joint Sealer
Infrastructure
Results

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Par Builders Storage
New Construction, Infrastructure - 103,255 SF
Pending Verification
$11,000,000 CJ est. value
Bunnell, FL 32110

Par Builders Storage
New Construction, Infrastructure - 103,255 SF
Pending Verification
$11,000,000 CJ est. value
Bunnell, FL 32110

SR 100 from N. Palmetto ST to Old Kings Rd South - Florida Department of Transportation
Infrastructure
Conception
$9,500,000 CJ est. value
Bunnell, FL 32110

Plantation Bay Section 2A-F Unit 16
New Construction, Infrastructure
Design
$29,000,000 CJ est. value
Bunnell, FL 32110

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Resurface Asphalt Parking Lot-CASA
Alteration
Results
$250,000 to $500,000 est. value
Saint Augustine, FL 32084

Last Updated 09/27/2023 12:24 PM
Project Title

Resurfacing / Traffic Signals / Sidewalk - SR 100

Physical Address View project details and contacts
City, State (County) Bunnell, FL 32110   (Flagler County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $17,923,461 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Counties: Flagler Road Name: SR 100 Limits: From N Palmetto St to E of Old Kings Rd S Project(s): 44521915201(*) Federal Aid No: D522057B Total Roadway Length: 4.570 Miles Contract Days: 370 Total Bridge Length: 0.000 Miles Total Proposal Length: 4.570 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 90 days Description: The Improvements under this Contract consist of rehabilitating the existing asphalt, pavement widening for shoulders and turn lanes, drainage modifications, and signalization, and lighting for pedestrians along State Road 100 from North Palmetto Street (MP 0.615) to east of Old Kings Road South (MP 5.185), approximately 4.5 miles in Flagler County. Additional improvements include sidewalk construction from MP 1.262 to MP 4.968. Question Deadline 9/20/2023 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order 014: Resurfacing / Traffic Signals / Sidewalk - SR 100 CT230927

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents