Similar Projects
First Avenue Flood Control
Infrastructure
Bidding
$5,952,358 to $7,205,486 est. value
Hines, IL 60153

Locust Street CSO Elimination and Water Main Replacement Phase III
Infrastructure
Bidding
Bloomington, IL 61701

Corrugated Steel Pipe
Post-Bid
Knoxville, IL 61448

Pipe Culverts
Post-Bid
Hardin, IL 62047

Removing the Existing Culvert and Installing a 10' X 6' Precast Concrete Box Culvert
Results
Less than $133,145 est. value
Quincy, IL 62305

Downtown Court Drainage Improvements
Results
Less than $51,000 est. value
Pekin, IL 61554

Combined Sewer Overflow Control Project - Year 1
Infrastructure, Alteration
Bidding
Peoria, IL

Residential Flood Control System Installation
Post-Bid
Skokie, IL

Culvert Replacement
Results
Morris, IL 60450

I-21-4741 Utility Relocation Under Union Pacific Railroad
Infrastructure
Bidding
Franklin Park, IL

Detention Pond Cleanout
Post-Bid
Dieterich, IL 62424

2020 Road Maintenance
Results
Riverwoods, IL 60015

4th Street Reconstruction and Drainage Improvements
Infrastructure
Bidding
Milledgeville, IL 61051

Furnish Pipe Culverts, Corrugated Steel Culvert Pipe
Post-Bid
Belleville, IL

2020 Drain in the City Right of Way Repair - Area 4-South 1
Results
Chicago, IL 60602

Reported 01/07/2022 12:00 AM
Project Title

Culverts for Middle Fork State Park

Physical Address View project details and contacts
City, State (County) Springfield, IL   (Sangamon County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Four new culverts. Supply and deliver Corrugated Metal Pipes (CMPs). The existing culverts have outlived their life expectancy, have rusted out at the bottom, eroded away at the at the end sections, and at various locations throughout the length of the culverts. There are 3 CMPs for Middle Fork State Park and 1 for Kickapoo State Park. There will be separate line items bids for the 2 locations but Bid will be awarded on sum for all items. All culverts will be delivered to Middle Fork State Park Office / Maintenance Building. IDNR will move the Kickapoo CMP from Middle Fork State Park to its final location.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents