Similar Projects
Roof Replacement
Post-Bid
Abington, MA

Police Headquarters` Roof Replacement
Alteration
Post-Bid
Plymouth, MA 02360

Central School ARP Roof Replacement - General Bid
Results
Less than $1,698,545 est. value
East Bridgewater, MA 02333

Roof Replacement for the Huntington Alternative School - General Bid
Results
$2,030,000 est. value
Brockton, MA 02301

Nemasket Roof Replacement Project
Alteration
Post-Bid
Less than $45,000 est. value
Middleborough, MA

Roof Replacement for the Huntington Alternative School - Filed Sub-Bid
Results
$2,030,000 est. value
Brockton, MA 02301

FY22 On-Call Commercial Roofing Repairs
Alteration
Post-Bid
Less than $100,000 est. value
Marshfield, MA

Routine Maintenance and Roof Repair
Results
Brockton, MA

Frederick Douglass Avenue Roof Replacement
Alteration
Post-Bid
Brockton, MA 02301

Remove and Replace - EDPM Roofing and Insulation
Results
$35,000 est. value
Abington, MA

H.M.L.P. Parking Lot Canopies with Solar Panels and Installation of Solar Panels on Building Roof
Alteration
Post-Bid
$1,000,000 est. value
Hingham, MA

Roofing Replacement at Garden Terrace Elderly Development
Results
Less than $52,000 est. value
Rockland, MA 02370

Roof Removal and Replacement
Alteration
Post-Bid
$1,090,000 est. value
Abington, MA 02351

On-Call Roofing Repairs and Maintenance Services
Alteration
Results
Plymouth, MA

Removal and Replacement of the Abington Library Roof
Alteration
Post-Bid
Abington, MA 02351

Reported 07/21/2022 12:00 AM
Project Title

Owners Project Manager for Nathaniel Morton Elementary School Roof Replacement and Associated Work

Physical Address View project details and contacts
City, State (County) Plymouth, MA 02360   (Plymouth County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $1,762,200 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Plymouth Public School Committee is seeking to replace the roof of the Nathaniel Morton Elementary School. The building was originally built in 1913 with subsequent additions. The total square footage of the roof is approximately 35,000 square feet. The roofs on this building consists of three lowslope roof sections and multiple steep-sloped asphalt shingle roof sections. The existing roof is approximately 20 years old and is beyond its life expectancy. Significant leaking has occurred in areas over the past several years. Portions of the roof were damaged during the October 2021 storm and have been repaired but will still need to be replaced.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents