Similar Projects
Backup Generators - Water and Wastewater Facilities
Alteration
Bidding
$7,788,900 est. value
Santa Rosa, CA

Emergency Backup Generator
Alteration
Post-Bid
CA

Generators For Water And Wastewater Facilities
Infrastructure
Post-Bid
Santa Rosa, CA

Design Build Contract-Public Safety Building Generator Replacement
Alteration
Results
Santa Rosa, CA 95404

Cooperage Emergency Generator Project
Alteration
Results
$709,907 est. value
Rohnert Park, CA

Inspection Maintenance - Generators
Alteration
Post-Bid
Santa Rosa, CA

Electrical System Upgrade - Stillwater Cove
Alteration
Results
Jenner, CA 95450

Employment Development Department - Electrical Services
Term Contract, Alteration
Post-Bid
Santa Rosa, CA 95401

LED Lighting Upgrade
Alteration
Results
$150,000 est. value
Petaluma, CA 94954

Warm Springs Fish Hatchery Electrical Maintenance and Repair
Term Contract
Post-Bid
$70,000 est. value
Geyserville, Ukiah, CA 95441

Mobile Generator on a Trailer
Alteration
Results
CA

Electrical Switchgear System - Warm Springs Dam
Alteration
Post-Bid
$400,000 est. value
Santa Rosa, CA

Sheriff`s Backup Generator
Alteration
Results
Santa Rosa, CA 95403

Generator Maintenance
Term Contract
Post-Bid
Eldridge, CA

Procurement of Wood Poles
Alteration
Post-Bid
Healdsburg, CA

Last Updated 06/29/2022 12:26 PM
Project Title

Schroeder Hall ADA Entry Ramp Lighting Project

Physical Address View project details and contacts
City, State (County) Rohnert Park, CA   (Sonoma County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Schroeder Hall ADA Entry Ramp Lighting Project at Sonoma State University. Install 40 LED lights, provided by owner, on underside of handrails at Schroeder Hall ADA Entry Ramp. The current lighting design uses BX cable that is cemented into an architectural landscape wall feature. Due to the permanence of this landscape wall feature, we’re unable to make necessary electrical repairs to the existing system. The North ramp is currently illuminated, while the South ramp is not. ork scope is as follows: ILLUMINATE EXISTING METAL HANDRAIL Drill– (40) holes on underside of 2” handrails that line the Schroeder Hall Entry steps to fit (40) Wagner™ Architectural Systems Lumenpod 28’s as indicated per drawings. Run – 24V electrical wire through handrails to each of the (40) holes. Install – (40) Wagner™ Architectural Systems Lumenpod 28’s as indicated per drawings and connect to 24V electrical wire. Install – (4) Wagner™ Architectural Systems Lumenpod 28 enclosures and (4) Wagner™ Architectural Systems Lumenpod 28 drivers with Lumenpod 28 kits as indicated per drawings and connect to 24V electrical wire ran through the handrails. Run – electrical wire from (4) Wagner™ Architectural Systems Lumenpod 28 drivers to 277V power which will be pulled from the (2) existing bollard style lights at top of the stairs. Must be trenched in conduit under the earth and under (1) sidewalk. Ensure – All (40) LED lights are operational and that all electrical connections and wire are both ran safely underground as per code requirements. Timeline – Spring 2022 – Weather dependent, SSU has all Wagner™ Architectural Systems Lumenpod 28s, drivers, driver enclosures, and Lumenpod 28 kits.

Details

Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents