Similar Projects
Dooley Court
Bidding
$1,097,130 est. value
Salt Lake City, UT 84102

Cottonwood Improvement District - Rehab 2021 Sewer Pipeline
Bidding
Sandy, UT

On-Call Task Order General Construction Services FY 19/20
Term Contract
Post-Bid
Salt Lake City, UT

1800 North Sewer Realignment
Post-Bid
Salt Lake City, UT 84116

2018 West Jordan Manhole Raising Project
Results
$161,900 est. value
West Jordan, UT

104th and Bangerter Relocation
Term Contract
Results
Less than $1,300,000 est. value
Bluffdale, UT 84065

Storm Drain Video Project to Camera Storm Drain Pipes and Structures
Post-Bid
Taylorsville, UT 84129

Installation and Repair of Sanitary Sewer Facilities
Results
Less than $125,000 est. value
Salt Lake City, UT

1700 South Storm Drain, from 2100 E to Emigration Creek
Post-Bid
Salt Lake City, UT 84115

MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Results
Less than $3,293,600 est. value
Salt Lake City, UT 84115

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Williams Building - Storm Water Conservation Garden
Results
$868,336 est. value
Salt Lake City, UT 84108

19D: Large Meter Replacement Project
Post-Bid
West Valley City, UT

Hillside Lane Storm Drain
Results
$150,000 to $200,000 est. value
Salt Lake City, UT 84106

Manhole Lids, Rings, Monuments and Related Items
Term Contract
Post-Bid
Salt Lake City, UT

Last Updated 12/01/2020 04:38 PM
Project Title

800 West - 600 South to 800 South

Physical Address View project details and contacts
City, State (County) South Jordan, UT   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,925,018
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1.CIPP Rehabilitation of approximately 5,707 LF of 60-inch RCP trunk line. 2.Internal reinstatement of approximately 100 service laterals at the connection of the 60-inch trunk line. 3.Rehabilitation of nineteen (19) manholes using an epoxy coating system. 4.CIPP Rehabilitation of approximately 635 LF of 8-inch and associated reinstatement of 9 service laterals. 5.Providing the necessary flow bypassing to complete all described work.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents