Similar Projects
Tapteal 1 Pump Station Upgrade
Infrastructure
Post-Bid
Richland, WA 99352

Water Station 5 Reservoirs and Pump Station
Infrastructure
Results
$28,250,000 est. value
Vancouver, WA 98687

Gooseberry Point Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Results
$13,000,000 to $14,500,000 est. value
Bellingham, WA 98226

Well No. 6
Alteration
Results
$2,189,000 est. value
College Place, WA 99324

Condensate Pump 1 Alpha Refurbishment
Alteration
Bidding
Richland, WA

Aurora 1160 Series Pump Refurbishment
Alteration
Post-Bid
Keyport, WA 98345

Kayak Well Rehabilitation
Infrastructure
Bidding
$90,000 est. value
Stanwood, WA 98292

Furnish and Install 60HP Input Pump Motor
Infrastructure
Bidding
Ridgefield, WA 98642

Hanford Integrated Tank Disposition Contract
Alteration
Bidding
WA

Reported 11/09/2021 05:03 PM
Project Title

CHRL Pump Station 1A, 2 and 3

Physical Address View project details and contacts
City, State (County) WA   (King County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Pre-Solicitation, Bidding Expected December 2021
Bids Due View project details and contacts
Estimated Value $750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents