Similar Projects
Wiley Boulevard Trail From 16th Avenue SouthWest To Williams Boulevard (Highway 151) - 325052 - City Of Cedar Rapids
Infrastructure
Conception
$300,000 CJ est. value
Cedar Rapids, IA 52404

Wiley Boulevard Trail From 16th Avenue SouthWest To Williams Boulevard (Highway 151) - 325052 - City Of Cedar Rapids
Infrastructure
Conception
$300,000 CJ est. value
Cedar Rapids, IA 52404

Ingleside Drive South West Pavement Improvements
Design
$250,000 est. value
Cedar Rapids, IA 52404

E Avenue North East from 19th Street to 20th Street
Design
$1,650,000 est. value
Cedar Rapids, IA 52402

Rapid Response Single Award Task Order Contract (SATOC)
New Construction
Post-Bid
Less than $95,000,000 est. value

Shelter Replacement
New Construction
Post-Bid
Marion, IA 52302

Trail Ridge Road South East from Southern Indiandale Road to Red Fox Road
Results
$1,510,000 est. value
Cedar Rapids, IA

8th Avenue South West from 15th Street South West to Rockford Road
Results
$3,220,000 est. value
Cedar Rapids, IA 52407

Phase 4 - Tower Terrace Road from C Avenue to W/o Barnsley Lane
Conception
$6,400,000 est. value
Cedar Rapids, IA 52407

M-HMA Patching
Infrastructure
Post-Bid
Cedar Rapids, IA

Cottage Grove Avenue South East from Forest Drive to 34th Street
Results
$1,580,000 est. value
Cedar Rapids, IA 52497

TIF Blairs Ferry Road Improvements And 18th Avenue Extension - 301881 - City Of Cedar Rapids
Infrastructure
Conception
$333,000 CJ est. value
Cedar Rapids, IA 52401

Marion Public Services Maintenance Facility - Steel Demo Package
Demolition
Post-Bid
Marion, IA

First Ave West Pavement Rehabilitation and Traffic Signals
Results
$2,470,000 est. value
Cedar Rapids, IA 52407

6th Street Northwest Extension from B Avenue to Ellis Boulevard - 301963 - City of Cedar Rapids
Conception
$6,700,000 est. value
Cedar Rapids, IA

Last Updated 05/08/2023 12:16 PM
Project Title

Site 2 - 30 Acre Cell Improvements

Physical Address View project details and contacts
City, State (County) Marion, IA 52302   (Linn County)
Category(s) Government/Public, Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Misc. Buildings, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $414,810 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Site preparation; excavation, hauling, grading, and placement of on-site soils; final cover access road construction; roadway tie-in; native plantings; leachate tank abandonment; leachate loadout structure demolition and removal; forcemain and electrical installation, and erosion controls. Latest Mobilization Date: Monday, June 26, 2023 Substantial Completion: Friday, October 6, 2023 A public meeting for this project will be held on April 18, 2023 during the monthly board meeting All questions in regard to this project will need to be submitted by May 3rd , 2023 at 5:00 PM local time. Bidders shall contact the HDR (Katie.Kinley@hdrinc.com and Morgan.Mays@hdrinc.com) for all questions directed towards this project.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents