Similar Projects
Beach Tilling
Term Contract
Results
Manasota Key, FL

SVC-REGRADESWALES/2021 - Regrading Swales and Restoration
Infrastructure
Results
Punta Gorda, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Babcock Webb (Yucca Pens Culvert)
Infrastructure
Post-Bid
$275,000 est. value
Punta Gorda, FL 33955

Elkcam Waterway Stormwater Control Structure
Results
$2,500,000 est. value
FL

Drainage Improvements
Results
Less than $1,728,446 est. value
FL

Babcock Ranch 2021 Spine Roads
Results
FL

Manasota Key Drainage Flap Maintenance
Term Contract, Infrastructure
Results
$80,000 est. value
Port Charlotte, PT CHARLOTTE, FL 33980

Various Crest Plate/Box Culvert Modifications
Results
$144,806 est. value
Port Charlotte, FL 33948

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Seawall Joint and Paver Repair Work - Live Oak Point
Results
Port Charlotte, FL 33980

MAR-SEAWALLPONCE/1511 - Seawall Replacement/Repair at Ponce de Leon Park
Results
Punta Gorda, FL 33950

Repairs to Three (3) Ponds
Results
Less than $141,825 est. value
Punta Gorda, FL

Mechanical Raking of Englewood Beach - Annual
Term Contract
Results
Englewood, FL 34223

Myakka State Forest Water Quality and Bank Stabilization in Sarasota County
Infrastructure
Bidding
Port Charlotte, FL 33981

Last Updated 09/10/2021 06:52 AM
Project Title

Port Charlotte Beach Park Shoreline Stabilization

Physical Address View project details and contacts
City, State (County) Port Charlotte, FL 33952   (Charlotte County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $173,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of furnishing all labor, equipment, supplies, materials, transportation, environmental protection and performing all operations in connection with the Port Charlotte Beach Park Shoreline Stabilization Project. The project area is located on the north side of Alligator Bay, within Charlotte Harbor, at Port Charlotte Beach Park, south of U.S. 41 in Port Charlotte. The project includes stabilizing approximately 200 linear feet of shoreline

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents