Similar Projects
Popeye's Louisiana Kitchen
New Construction - 2,700 SF
Design
$500,000 to $1,000,000 CJ est. value
Richardson, TX 75081

Target #875
Renovation - 6,400 SF
Design
$500,000 est. value
Dallas, TX 75204

Montfort Drive Paving and Drainage Improvements
Bidding
Dallas, TX 75295

Reconstruction of Plantation Drive and Mossy Oaks Street
Bidding
$4,798,819 est. value
Coppell, TX 75019

Northcrest Estates Section 3 Street Reconstruction
Post-Bid
Carrollton, TX 75006

Sapphire Bay Resort Hotel, Crystal Lagoon, and Surf Park - Marina Road, Public Boat Ramp, and Public Utilities - Lake Ray Hubbard
Post-Bid
Rowlett, TX 75088

Southern Region Disaster Recovery Support BPA
Results

Total Routine Maintenance of President George Bush Turnpike (West) and Mountain Creek Lake Bridge
Term Contract
Results
$48,787,200 est. value
Grand Prairie, TX

Hawaiian Bros.
Renovation - 4,000 SF
Design
Addison, TX

Alley Reconstruction Group 17-1203
Bidding
Dallas, TX 75248

DNT and SRT Concrete Pavement Joint and Crack Sealing
Post-Bid
Coppell, TX 75019

Addison Town Hall Drive and Lake Forrest Drive Pavement Replacement
Results
Dallas, TX 75254

Paving Improvements for Galloway Place Neighborhood and Northridge Addition Repairs
Bidding
$1,200,000 est. value
Mesquite, TX

Paving and Drainage Improvements for Pearl Street from Pacific Avenue to Live Oak Street - PB06U798
Post-Bid
Dallas, TX 75201

Bond 36 - Month Street Resurfacing and Street Improvements for the 2017 Capital Bond Program
Term Contract
Results
Dallas, TX 75201

Last Updated 04/02/2020 08:07 AM
Project Title

Seeton Road - Phase 2 Paving, Drainage, Water and Sanitary Sewer Improvements and Taaffe Creek Stream Stability Improvements

Physical Address View project details and contacts
City, State (County) Grand Prairie, TX 75050   (Dallas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Seeton Road- Phase 2 Paving, Drainage, Water and Sanitary Sewer Improvements W.O.#615.68: Paving, drainage, water and sanitary sewer improvements for approximately 4,900 linear feet of Seeton Road between Miraflores and Day Miar Road including 73 L.F. of 6-7’x5’ multiple box culvert, 76 L.F. of 8’x3’ box culvert, 510 L.F. of 4’x3’ box culvert, 1,947 L.F of 42” thru 24” RCP, 22,410 SY of 8” reinforced concrete pavement, 23,670 SY of 8” flex-base for sub-grade 2,410 L.F of 12” water line improvements, 1,610 L.F. of 8” sanitary sewer line improvements, and the decommissioning of an existing lift station along Seeton Road. Taaffe Creek Stream Stability Improvements W.O.#615.76: 100 Cubic yards of 24” non-grouted Rock riprap, 120 CY of unclassified channel excavation and other miscellaneous and related items of work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents